Revision history of "Zvolen – ha, ensuring the late continuity and the passage of concrete slip below ha ou and the hate itself" (Q3101383)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:5309:53, 9 October 2024DG Regio talk contribs 70,040 bytes −2 Changed label, description and/or aliases in pt
  • curprev 09:5309:53, 9 October 2024DG Regio talk contribs 70,042 bytes +62 Set a claim value: summary (P836): O projeto diz respeito à construção de um biocorredor – uma conduta para peixes, que permitirá aos peixes ultrapassar duas barreiras existentes no curso de água Hron em Zvolen, nomeadamente uma rampa de lançamento em betão no km 156,33 e uma aba hať no km 156,85, localizada diretamente no rio Hron e MVE no km 156,520, que, juntamente com o canal de resíduos, cria um braço paralelo de Hron, assegurando assim a continuidade longitudinal do fluxo no lo...

20 March 2024

10 June 2023

4 August 2022

  • curprev 00:2900:29, 4 August 2022DG Regio talk contribs 69,255 bytes +45,120 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:5120:51, 29 November 2021DG Regio talk contribs 16,595 bytes +2,265 Created claim: summary (P836): Das Projekt befasst sich mit dem Bau eines Biokorridors – einem Fischkanal, der es Fischen ermöglicht, zwei bestehende Barrieren auf dem Wasserlauf Hron in Zvolen zu überwinden, nämlich Betonrutsche in km 156,33 und Flap Ha-in km 156.85, direkt am Fluss Hron und MVE in km 156.520, die zusammen mit dem Abfallkanal einen Parallelarm von Hron schafft, wodurch die Längskontinuität des Flusses in dem betreffenden Gebiet gewährleistet wird. Das Fischr...
  • curprev 20:5120:51, 29 November 2021DG Regio talk contribs 14,330 bytes +181 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 13:0613:06, 27 November 2021DG Regio talk contribs 14,149 bytes +2,384 Created claim: summary (P836): Le projet porte sur la construction d’un biocorridor — un canal de poisson, qui permettra aux poissons de surmonter 2 barrières existantes sur le cours d’eau Hron à Zvolen, à savoir une cale en béton au km 156,33 et une rabat au km 156,85, situé directement sur le fleuve Hron et le MVE au km 156.520, ce qui, avec le canal des déchets, crée un bras parallèle de Hron, assurant ainsi la continuité longitudinale du débit sur le site en question. Le...
  • curprev 13:0613:06, 27 November 2021DG Regio talk contribs 11,765 bytes +193 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 13:5813:58, 28 September 2021DG Regio talk contribs 11,572 bytes +2,241 Created claim: summary (P836): The project deals with the construction of a biocorridor – a fish duct, which will enable fish to overcome 2 existing barriers on the watercourse Hron in Zvolen, namely concrete slipway in km 156,33 and flap hať in km 156.85, located directly on the river Hron and MVE in km 156.520, which together with the waste channel creates a parallel arm of Hron, thus ensuring the longitudinal continuity of the flow in the site in question. The fish pipe is...

27 September 2021

24 September 2021

23 September 2021

15 September 2021

  • curprev 15:4015:40, 15 September 2021DG Regio talk contribs 11,116 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:2013:20, 15 September 2021DG Regio talk contribs 10,689 bytes +168 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2013:20, 15 September 2021DG Regio talk contribs 10,521 bytes +2,221 Created claim: summary (P836): The project is to build a fish duct biocorridor, which will permeate the fish over 2 existing barriers on the watercourse Hron in Zvolen, namely concrete slipway in km 156,33 and flap ha in km 156.85, which are located directly on the river Hron and at the same time MVE in km 156.520, which together with the waste channel creates the contemporaneous arm of Hron, thus ensuring the slow continuity of the flow in the area in question. The fish pipe...

14 September 2021