Revision history of "Wilson’s embankment cycle route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Siho)" (Q3100822)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:5109:51, 9 October 2024DG Regio talk contribs 72,350 bytes +5 Changed label, description and/or aliases in pt
  • curprev 09:5109:51, 9 October 2024DG Regio talk contribs 72,345 bytes +2 Set a claim value: summary (P836): Projeto «Aterro de Cyklotrasa Wilson – (Ponte Universitária) – Mostná ul. — Jesenský ul. (Park Sihoť)" está em consonância com o material conceptual "The concept of cycling traffic in Nitra". Por conseguinte, na primeira fase (até 2020), o material deve ser completado com cerca de 27,30 km de ciclismo. «The Wilson Waterfront Cycling Route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Sihoť)" é uma das actividades e troços planeados com um...

7 March 2024

12 June 2023

4 August 2022

  • curprev 00:1200:12, 4 August 2022DG Regio talk contribs 71,619 bytes +46,843 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:4420:44, 29 November 2021DG Regio talk contribs 17,053 bytes +2,411 Created claim: summary (P836): Projekt "Cyklotrasa Wilson’s Böschung – (Universitätsbrücke) – Mostná ul. — Jesenský ul. (Park Sihoe)" steht im Einklang mit dem konzeptionellen Material "Die Konzeption des Radverkehrs in Nitra“. Dementsprechend soll das Material in der ersten Phase (bis 2020) ca. 27,30 km Radfahren. „Der Wilson Waterfront Radweg – (Universitätsbrücke) – Mostná ul. — Jesenský ul. (Park Sihoe)" ist eine der geplanten Aktivitäten und Abschnitte mit einer Gesamtlä...
  • curprev 20:4420:44, 29 November 2021DG Regio talk contribs 14,642 bytes +157 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 12:5712:57, 27 November 2021DG Regio talk contribs 14,485 bytes +2,556 Created claim: summary (P836): Projet "Cyklotrasa Wilson’s remblai — (Pont de l’Université) — Mostná ul. — Jesenský ul. (Park Siho')" est en ligne avec le matériel conceptuel "La conception de la circulation cycliste dans Nitra». En conséquence, dans la première étape (jusqu’en 2020), le matériel doit être achevé environ. 27,30 km de vélo. «La Route cyclable du front de mer Wilson — (Pont de l’Université) — Mostná ul. — Jesenský ul. (Park Siho')" est l’une des activités et se...
  • curprev 12:5712:57, 27 November 2021DG Regio talk contribs 11,929 bytes +162 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 13:5413:54, 28 September 2021DG Regio talk contribs 11,767 bytes +2,361 Created claim: summary (P836): Project "Cyklotrasa Wilson’s embankment – (University Bridge) – Mostná ul. — Jesenský ul. (Park Sihoť)" is in line with the conceptual material "The conception of cycling traffic in Nitra”. Accordingly, in the first stage (until 2020) the material is to be completed approx. 27,30 km of cycling. “The Wilson Waterfront Cycling Route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Sihoť)" is one of the planned activities and sections with a...

27 September 2021

24 September 2021

23 September 2021

15 September 2021

  • curprev 15:2915:29, 15 September 2021DG Regio talk contribs 11,290 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:0913:09, 15 September 2021DG Regio talk contribs 10,863 bytes +163 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0913:09, 15 September 2021DG Regio talk contribs 10,700 bytes +2,323 Created claim: summary (P836): Project Wilson Waterway Cyclotra – (University Bridge) – Mostná ul. — Jesenský ul. (Park Siho) is in accordance with the conceptual material Conception of cycling transport in Nitra. Accordingly, the material should be completed in the first stage (until 2020). 27,30 km of cycling. Wilson waterfront cycle route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Siho) is one of the planned activities and sections with a total of 1 995.57 met...

14 September 2021