Revision history of "VKB3 Coke Services" (Q3100665)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 08:5908:59, 11 October 2024DG Regio talk contribs 85,005 bytes +14 Set a claim value: summary (P836): O projeto «Dedicação do serviço de coque VKB 3» apresenta uma proposta de modernização do atual sistema de despoeiramento do equipamento tecnológico do serviço de coque (a seguir designado «KS») relativo à bateria em grande escala do forno de coque n.o 3 (a seguir designada «VKB 3»), que consiste em locais de trabalho individuais interligados pelo tráfego de via localizados em edifícios fechados, a fim de reduzir o nível global de poluição atmosféri...

23 March 2024

10 June 2023

4 August 2022

  • curprev 00:0700:07, 4 August 2022DG Regio talk contribs 84,266 bytes +55,691 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:4320:43, 29 November 2021DG Regio talk contribs 19,094 bytes +2,945 Created claim: summary (P836): Das Projekt „Dedication of the coke service VKB 3“ enthält einen Vorschlag zur Modernisierung des bestehenden Entstaubungssystems für die Kokereitechnologieausrüstung (nachstehend „KS“ genannt) für die Kokereibatterie Nr. 3 (im Folgenden VKB 3), die aus einzelnen Arbeitsplätzen besteht, die durch Gleisverkehr in Gebäuden miteinander verbunden sind, um das Gesamtniveau der Luftverschmutzung durch Primär- und Sekundäremissionen von Partikeln (im F...
  • curprev 20:4320:43, 29 November 2021DG Regio talk contribs 16,149 bytes +92 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 12:5512:55, 27 November 2021DG Regio talk contribs 16,057 bytes +3,191 Created claim: summary (P836): Le projet «Désignation du service de coke VKB 3» présente une proposition de modernisation du système de dépoussiérage existant sur l’équipement technologique de service du coke (ci-après dénommé «KS») sur la batterie à coke à grande échelle no 3 (ci-après dénommée «VKB 3)», qui consiste en des lieux de travail individuels interconnectés par la circulation des voies situées dans des bâtiments fermés afin de réduire le niveau global de pollution...
  • curprev 12:5512:55, 27 November 2021DG Regio talk contribs 12,866 bytes +98 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 13:5313:53, 28 September 2021DG Regio talk contribs 12,768 bytes +2,966 Created claim: summary (P836): The project ‘Dedication of the coke service VKB 3’ presents a proposal for the modernisation of the existing dedusting system on the coke service technological equipment (hereinafter referred to as the KS) on the large-scale coke oven battery No. 3 (hereinafter referred to as VKB 3), which consists of individual workplaces interconnected by track traffic located in building-closed buildings in order to reduce the overall level of air pollution b...

27 September 2021

24 September 2021

23 September 2021

15 September 2021

  • curprev 15:2615:26, 15 September 2021DG Regio talk contribs 12,295 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:1113:11, 15 September 2021DG Regio talk contribs 11,868 bytes +77 Changed label, description and/or aliases in en: translated_label
  • curprev 13:1113:11, 15 September 2021DG Regio talk contribs 11,791 bytes +2,928 Created claim: summary (P836): The VKB 3 coke service work project presents a proposal for the modernisation of the existing dusting system at the coke service technological equipment (hereinafter referred to as KS) on the coke oven battery No. 3 (hereinafter referred to as VKB 3), which consists of individual workplaces interconnected by belt traffic located in building-closed buildings in order to reduce the overall level of air pollution by primary and secondary (fugitive)...

14 September 2021