Revision history of "Provision of monitoring committees, coordination meetings and negotiations to support the implementation of the OPII" (Q3100630)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

19 June 2023

10 June 2023

4 August 2022

  • curprev 00:0600:06, 4 August 2022DG Regio talk contribs 61,799 bytes +39,983 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:4520:45, 29 November 2021DG Regio talk contribs 15,332 bytes +1,976 Created claim: summary (P836): Im Rahmen der Durchführung des operationellen Programms „Integrierte Infrastruktur“ (OPII) war es notwendig, den Stand der Vorbereitung und Durchführung von Projekten im Rahmen von OPII zu überwachen, zu bewerten und zu überprüfen. Ziel des Projekts ist es, eine wirksame Vorbereitung, Verwaltung und Durchführung von Verkehrsinfrastrukturprojekten sicherzustellen. Das Projekt Überwachungsausschüsse, Koordinierungssitzungen und Verhandlungen zur U...
  • curprev 20:4520:45, 29 November 2021DG Regio talk contribs 13,356 bytes +183 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 12:5512:55, 27 November 2021DG Regio talk contribs 13,173 bytes +2,054 Created claim: summary (P836): Dans le cadre de la mise en œuvre du programme opérationnel «Infrastructures intégrées», il a été nécessaire de suivre, d’évaluer et de vérifier l’état d’avancement de la préparation et de la mise en œuvre des projets relevant de l’OPII. L’objectif du projet est d’assurer une préparation, une gestion et une mise en œuvre efficaces des projets d’infrastructures de transport. Le projet Assurer la mise en œuvre des comités de suivi, des réunions de...
  • curprev 12:5512:55, 27 November 2021DG Regio talk contribs 11,119 bytes +190 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 13:5313:53, 28 September 2021DG Regio talk contribs 10,929 bytes +1,895 Created claim: summary (P836): In the context of the implementation of the Operational Programme Integrated Infrastructure (OPII), there has been a need to monitor, evaluate and check the status of the preparation and implementation of projects under OPII. The aim of the project is to ensure effective preparation, management and implementation of transport infrastructure projects. The project Ensuring monitoring committees, coordination meetings and negotiations to support th...

27 September 2021

24 September 2021

23 September 2021

15 September 2021

  • curprev 15:3015:30, 15 September 2021DG Regio talk contribs 10,514 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:1013:10, 15 September 2021DG Regio talk contribs 10,087 bytes +176 Changed label, description and/or aliases in en: translated_label
  • curprev 13:1013:10, 15 September 2021DG Regio talk contribs 9,911 bytes +1,915 Created claim: summary (P836): In the context of the implementation of the Operational Programme Integrated Infrastructure (OPII), there was a need for monitoring, evaluation and control of the state of preparation and implementation of projects under OPII. The aim of the project is to ensure effective preparation, management and implementation of transport infrastructure projects. The project Ensuring Monitoring Committees, Coordination Consultations and Negotiations to supp...

14 September 2021