Revision history of "D1 Hričovské Podhradie – Lietavská Lúčka, Phase II" (Q3100618)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:5720:57, 10 October 2024DG Regio talk contribs 48,224 bytes 0 Changed label, description and/or aliases in pt
  • curprev 20:5720:57, 10 October 2024DG Regio talk contribs 48,224 bytes 0 Set a claim value: summary (P836): O principal objetivo do projeto é a construção da autoestrada D1 no troço Hričovské Podhradie – Lietavská Lúčka, com uma extensão de 11,317 km, que faz parte do principal corredor da RTE-T. O projeto é uma das fases da construção do investimento do projeto e parte da solução técnica para a construção da autoestrada D1 desde Hričovské Podhradie via Lietavská Lúčka, o túnel de Višňové até à estrada de primeira classe I/18 em Dubná Skala. O projeto est...

22 March 2024

28 June 2023

19 June 2023

10 June 2023

10 March 2023

9 March 2023

4 August 2022

  • curprev 00:0600:06, 4 August 2022DG Regio talk contribs 46,715 bytes +28,263 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:4220:42, 29 November 2021DG Regio talk contribs 12,919 bytes +1,408 Created claim: summary (P836): Hauptziel des Projekts ist der Bau der Autobahn D1 im Abschnitt Hričovské Podhradie – Lietavská Lúčka mit einer Länge von 11,317 km, der Teil des TEN-V-Hauptkorridors ist. Das Projekt ist eine der Phasen des Investitionsbaus des Projekts und Teil der technischen Lösung für den Bau der Autobahn D1 von Hričovské Podhradie über Lietavská Lúčka, dem Tunnel Višňové zur 1. Klasse Straße I/18 in Dubná Skala. Das Projekt befindet sich im Zentrum der Slo...
  • curprev 20:4220:42, 29 November 2021DG Regio talk contribs 11,511 bytes +116 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 12:5512:55, 27 November 2021DG Regio talk contribs 11,395 bytes +1,489 Created claim: summary (P836): L’objectif principal du projet est la construction de l’autoroute D1 dans le tronçon Hričovské Podhradie — Lietavská Lúčka d’une longueur de 11,317 km, qui fait partie du corridor principal du RTE-T. Le projet est l’une des phases d’investissement du projet et une partie de la solution technique pour la construction de l’autoroute D1 de Hričovské Podhradie en passant par Lietavská Lúčka, le tunnel de Višňové jusqu’à la route I/18 de première cla...
  • curprev 12:5512:55, 27 November 2021DG Regio talk contribs 9,906 bytes +116 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 13:5313:53, 28 September 2021DG Regio talk contribs 9,790 bytes +1,430 Created claim: summary (P836): The main objective of the project is the construction of the D1 motorway in the section Hričovské Podhradie – Lietavská Lúčka with a length of 11.317 km, which is part of the main TEN-T corridor. The project is one of the phases of investment construction of the project and part of the technical solution for the construction of the D1 motorway from Hričovské Podhradie via Lietavská Lúčka, the Višňové tunnel to the 1st class road I/18 in Dubná Sk...

27 September 2021

24 September 2021

23 September 2021

15 September 2021

  • curprev 15:3015:30, 15 September 2021DG Regio talk contribs 9,372 bytes +427 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:1013:10, 15 September 2021DG Regio talk contribs 8,945 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 13:1013:10, 15 September 2021DG Regio talk contribs 8,829 bytes +1,443 Created claim: summary (P836): The main objective of the project is the construction of the D1 diažnica in the section Hričovské Podhradie – Lietavská Lúčka with a length of 11.317 km, which is a part of the main TEN-T corridor. The project is one of the phases of the investment construction of the project and the current technical solution for the construction of the D1 diažnica from Hričovské Podhradie through Lietavská Lúčka, the Viňové tunnel to the 1st class road I/18 in...

14 September 2021