Revision history of "Technical assistance for the implementation and integration of ITS systems and development of the National ITS Architecture" (Q3100506)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

12 June 2023

21 February 2023

4 August 2022

  • curprev 00:0200:02, 4 August 2022DG Regio talk contribs 73,190 bytes +39,646 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

6 December 2021

1 December 2021

  • curprev 08:4808:48, 1 December 2021DG Regio talk contribs 26,985 bytes +1,971 Created claim: summary (P836): Allgemeines Ziel des Projekts ist die Steigerung der wirtschaftlichen Effizienz des Verkehrsnetzes in Rumänien. Das spezifische operationelle Ziel besteht darin, die Reisegeschwindigkeit zu verbessern, indem der Verkehr auf der bestehenden Strecke (A1, A3) entlastet wird, wodurch auch die Konnektivität auf regionaler Ebene verbessert wird. Das vorliegende Projekt sieht die Ausarbeitung der Machbarkeitsstudie und des technischen Projekts für 4 In...
  • curprev 08:4808:48, 1 December 2021DG Regio talk contribs 25,014 bytes +193 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:2915:29, 27 November 2021DG Regio talk contribs 24,821 bytes +2,076 Created claim: summary (P836): L’objectif général du projet est d’accroître l’efficacité économique du réseau de transport en Roumanie. L’objectif opérationnel spécifique est d’améliorer la vitesse de déplacement en décongestionnant le trafic sur la ligne existante (A1, A3), améliorant ainsi également la connectivité au niveau régional. Le présent projet prévoit l’élaboration de l’étude de faisabilité et du projet technique pour 4 objectifs d’investissement, comme suit: • Obj...
  • curprev 15:2915:29, 27 November 2021DG Regio talk contribs 22,745 bytes +200 Changed label, description and/or aliases in fr: translated_label

10 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5810:58, 16 September 2021DG Regio talk contribs 14,465 bytes +183 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5810:58, 16 September 2021DG Regio talk contribs 14,282 bytes +1,969 Created claim: summary (P836): The general objective of the project is to increase the economic efficiency of the transport network in Romania. The specific operational objective is to bring improvements in travel speed by decongesting traffic on the existing route (A1, A3), thus also improving connectivity at regional level. The present project envisages the elaboration of the Feasibility Study and the technical project for 4 Investment Objectives, as follows: • Objective 1:...

14 September 2021