Revision history of "Highway Sebes – Turda" (Q3100002)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

5 June 2024

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:4723:47, 3 August 2022DG Regio talk contribs 58,328 bytes +34,590 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 09:0109:01, 1 December 2021DG Regio talk contribs 18,151 bytes +1,787 Created claim: summary (P836): Die wichtigsten sozioökonomischen Ziele der Projekte sind: — Bau von: 8 Kreuzungen (einschließlich Dumbrava-Straßenkreuzung), 4 Service, 4 Ruhebereiche, 1 Wartungs- und Kontrollzentrum, 1 Wartungs- und Überwachungszentrum und 66 Strukturen; — Bis Ende 202 070,00 km einer neuen Autobahn 2x2 für die Verbindung zwischen Sebes und Turda zu gewährleisten; — Die Verkehrseffizienz durch Verkürzung der Reisezeit zu verbessern; — Verbesserung der Verkehr...
  • curprev 09:0109:01, 1 December 2021DG Regio talk contribs 16,364 bytes +83 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:1315:13, 27 November 2021DG Regio talk contribs 16,281 bytes +1,843 Created claim: summary (P836): Les principaux objectifs socio-économiques des projets sont les suivants: — Construction de: 8 jonctions (y compris le carrefour routier Dumbrava), 4 services, 4 aires de repos, 1 centre d’entretien et de contrôle, 1 centre d’entretien et de surveillance et 66 structures; — À assurer d’ici la fin de 2020, 70,00 km d’une nouvelle autoroute 2x2 pour la liaison entre Sebes et Turda; — Améliorer l’efficacité du trafic en réduisant le temps de trajet...
  • curprev 15:1315:13, 27 November 2021DG Regio talk contribs 14,438 bytes +84 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5110:51, 16 September 2021DG Regio talk contribs 11,665 bytes +82 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5110:51, 16 September 2021DG Regio talk contribs 11,583 bytes +1,705 Created claim: summary (P836): The main socio-economic objectives of the projects are: — Construction of: 8 junctions (including Dumbrava road junction), 4 service, 4 rest areas, 1 maintenance and control center, 1 maintenance and monitoring center and 66 structures; — To ensure by the end of 2020, 70,00 km of a new 2x2 motorway for the connection between Sebes and Turda; — To improve the traffic efficiency through reduction of the travel time; — To improve transport efficien...

14 September 2021