Revision history of "Port Brăila – Infrastructure works of the port sector in the Basin Docks" (Q3099972)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:4623:46, 3 August 2022DG Regio talk contribs 111,735 bytes +73,741 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 09:0009:00, 1 December 2021DG Regio talk contribs 25,706 bytes +3,860 Created claim: summary (P836): Allgemeines Ziel des Projekts ist die Modernisierung und Entwicklung des Hafens Braila, um optimale Bedingungen für den Güterverkehr zu schaffen, um eine nachhaltige Mobilität auf nationaler, regionaler und lokaler Ebene zu fördern, die in der Lage ist, schnelle und effiziente Verbindungen zu den internationalen Märkten zu gewährleisten und gleichzeitig eine Hafeninfrastruktur nach europäischen Standards im Rahmen des spezifischen LIOP-Ziels (OS...
  • curprev 09:0009:00, 1 December 2021DG Regio talk contribs 21,846 bytes +138 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:1715:17, 27 November 2021DG Regio talk contribs 21,708 bytes +4,177 Created claim: summary (P836): L’objectif général du projet est la modernisation et le développement du port de Braila afin de fournir des conditions optimales pour le transport de marchandises, afin de promouvoir une mobilité durable aux niveaux national, régional et local, capable d’assurer des liaisons rapides et efficaces avec les marchés internationaux, tout en assurant une infrastructure portuaire conforme aux normes européennes dans le cadre de l’objectif spécifique LI...
  • curprev 15:1715:17, 27 November 2021DG Regio talk contribs 17,531 bytes +148 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5010:50, 16 September 2021DG Regio talk contribs 15,591 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5010:50, 16 September 2021DG Regio talk contribs 15,457 bytes +3,688 Created claim: summary (P836): The general objective of the project is the modernisation and development of the Braila Port in order to provide optimal conditions for freight transport, in order to promote sustainable mobility at national, regional and local level, capable of ensuring fast and efficient links with international markets, while ensuring a port infrastructure at European standards in the context of the specific LIOP Objective (OS) 2.4. Increasing the volume of g...

14 September 2021