Revision history of "Investments in broadband infrastructure in Timis and Caras-Severin counties" (Q3099776)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:3022:30, 9 October 2024DG Regio talk contribs 74,132 bytes +1 Changed label, description and/or aliases in pt
  • curprev 22:3022:30, 9 October 2024DG Regio talk contribs 74,131 bytes +2 Set a claim value: summary (P836): O principal objetivo do projeto consiste em realizar investimentos em infraestruturas de banda larga nas zonas brancas NGA nos distritos de Timis e Caras Severin, com uma ampla difusão de nós de comunicação e da parte de transmissão de dados (espinha dorsal e blackhaul), o mais próximo possível do utilizador final e com níveis adequados de simetria e interatividade, a fim de garantir uma melhor transmissão de informações em ambos os sentidos. Ao int...

5 June 2024

12 March 2024

19 June 2023

11 June 2023

21 February 2023

3 August 2022

  • curprev 23:4023:40, 3 August 2022DG Regio talk contribs 73,525 bytes +44,407 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

6 December 2021

1 December 2021

  • curprev 08:4908:49, 1 December 2021DG Regio talk contribs 21,689 bytes +2,331 Created claim: summary (P836): Hauptziel des Projekts ist es, Investitionen in die Breitbandinfrastruktur in weißen NGA-Gebieten in den Landkreisen Timis und Caras Severin mit einer breiten Verbreitung der Kommunikationsknoten und des Datenübertragungsteils (Backbone und Blackhaul) so nah wie möglich an den Endnutzer und mit einem angemessenen Maß an Symmetrie und Interaktivität zu tätigen, um eine bessere Informationsübertragung in beide Richtungen zu gewährleisten. Durch di...
  • curprev 08:4908:49, 1 December 2021DG Regio talk contribs 19,358 bytes +145 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:0015:00, 27 November 2021DG Regio talk contribs 19,213 bytes +2,435 Created claim: summary (P836): L’objectif principal du projet est de réaliser des investissements dans les infrastructures à haut débit dans les zones blanches de NGA dans les comtés de Timis et de Caras Severin, avec un large éventail de nœuds de communication et la partie de transmission de données (backbone et blackhaul), aussi près que possible de l’utilisateur final et avec des niveaux adéquats de symétrie et d’interactivité, afin de garantir une meilleure transmission d...
  • curprev 15:0015:00, 27 November 2021DG Regio talk contribs 16,778 bytes +161 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 11:0711:07, 16 September 2021DG Regio talk contribs 13,031 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 11:0711:07, 16 September 2021DG Regio talk contribs 12,897 bytes +2,191 Created claim: summary (P836): The main objective of the project is to make investments in broadband infrastructure in NGA white areas in Timis and Caras Severin counties, with a wide spread of communication nodes and the data transmission part (backbone and blackhaul), as close as possible to the end user and with adequate levels of symmetry and interactivity, in order to guarantee better transmission of information in both directions. By introducing the Next Generation Acce...

14 September 2021