Revision history of "Measures to increase traffic capacity on DN 1 – Prahova Valley, Comarnic – Predeal road sector" (Q3099252)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

5 June 2024

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:2323:23, 3 August 2022DG Regio talk contribs 81,202 bytes +48,947 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

6 December 2021

1 December 2021

  • curprev 09:0109:01, 1 December 2021DG Regio talk contribs 24,098 bytes +2,501 Created claim: summary (P836): Allgemeines Ziel des Projekts ist die Steigerung der wirtschaftlichen Effizienz des Verkehrsnetzes in Rumänien. Das spezifische operationelle Ziel besteht darin, die Reisegeschwindigkeit zwischen Comarnic und Predeal zu verbessern, indem der Verkehr auf der bestehenden Strecke (DN1) entlastet wird, wodurch auch die Anbindung auf regionaler Ebene verbessert wird. Das vorliegende Projekt sieht die Ausarbeitung der Machbarkeitsstudie und des Projek...
  • curprev 09:0109:01, 1 December 2021DG Regio talk contribs 21,597 bytes +169 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4314:43, 27 November 2021DG Regio talk contribs 21,428 bytes +2,643 Created claim: summary (P836): L’objectif général du projet est d’accroître l’efficacité économique du réseau de transport en Roumanie. L’objectif opérationnel spécifique est d’améliorer la vitesse de déplacement entre Comarnic et Predeal, en décongestionnant le trafic sur la route existante (DN1), améliorant ainsi également la connectivité au niveau régional. Le présent projet prévoit l’élaboration de l’étude de faisabilité et du projet de mise en œuvre technique pour 6 obje...

26 November 2021

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5210:52, 16 September 2021DG Regio talk contribs 14,118 bytes +157 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5210:52, 16 September 2021DG Regio talk contribs 13,961 bytes +2,487 Created claim: summary (P836): The general objective of the project is to increase the economic efficiency of the transport network in Romania. The specific operational objective is to bring improvements in travel speed between Comarnic and Predeal, by decongesting traffic on the existing route (DN1), thus also improving connectivity at regional level. The present project envisages the elaboration of the Feasibility Study and the Technical Implementation Project for 6 Investm...

14 September 2021