Revision history of "Rehabilitation DN56, Craiova-Calafat, km 0+ 000 + km 84+ 020 (phase II)" (Q3099210)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 10:0110:01, 8 October 2024DG Regio talk contribs 45,519 bytes +2 Changed label, description and/or aliases in pt
  • curprev 10:0110:01, 8 October 2024DG Regio talk contribs 45,517 bytes +3 Set a claim value: summary (P836): Reabilitação de 80 435 km, construção de 2 novas pontes, 5 pontes reabilitadas, 67 pontes e 17 intersecções. Reabilitação dos 12 lugares de estacionamento existentes. A melhoria das condições gerais de tráfego, em resultado da via de circunvalação, conduz a poupanças entre 60 % e 62 % e, expressas em minutos, o ganho de tempo situa-se entre 12,3 minutos (para os automóveis) e 13,8 minutos para os veículos pesados.

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:2223:22, 3 August 2022DG Regio talk contribs 46,267 bytes +25,777 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

6 December 2021

1 December 2021

  • curprev 08:5908:59, 1 December 2021DG Regio talk contribs 16,346 bytes +1,237 Created claim: summary (P836): Sanierung von 80,435 km, Bau von 2 neuen Brücken, 5 rehabilitierten Brücken, 67 Brücken und 17 Kreuzungen. Auch die Sanierung der 12 vorhandenen Parkplätze. Die Verbesserung der allgemeinen Verkehrsbedingungen infolge der Umgehungsstrecke führt zu Einsparungen zwischen 60 % und 62 % und ausgedrückt in Minuten, der Zeitgewinn liegt zwischen 12,3 Minuten (für Pkw) und 13,8 Minuten für schwere Fahrzeuge., translated_summary
  • curprev 08:5908:59, 1 December 2021DG Regio talk contribs 15,109 bytes +132 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4314:43, 27 November 2021DG Regio talk contribs 14,977 bytes +1,299 Created claim: summary (P836): Remise en état de 80,435 km, construction de 2 nouveaux ponts, 5 ponts réhabilités, 67 ponts et 17 intersections. En outre, remise en état des 12 places de stationnement existantes. L’amélioration des conditions générales de circulation, résultant de l’itinéraire de contournement, conduit à des économies de 60 % à 62 % et exprimées en minutes, le gain de temps est compris entre 12,3 minutes (pour les voitures) et 13,8 minutes pour les véhicules...

26 November 2021

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5110:51, 16 September 2021DG Regio talk contribs 10,856 bytes +132 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5110:51, 16 September 2021DG Regio talk contribs 10,724 bytes +1,233 Created claim: summary (P836): Rehabilitation of 80,435 km, construction of 2 new bridges, 5 rehabilitated bridges, 67 bridges and 17 intersections. Also, rehabilitation of the 12 existing parking spaces. The improvement of the general traffic conditions, as a result of the bypass route, leads to savings of between 60 % and 62 % and expressed in minutes, the time gain is between 12.3 minutes (for cars) and 13.8 minutes for heavy vehicles., translated_summary

14 September 2021