Revision history of "“Modernisation of electromechanical interlocking installations on Ilia – Lugoj – Phase II”" (Q3099047)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:3423:34, 8 October 2024DG Regio talk contribs 108,340 bytes +1 Changed label, description and/or aliases in pt
  • curprev 23:3423:34, 8 October 2024DG Regio talk contribs 108,339 bytes +32 Set a claim value: summary (P836): O objetivo do projeto é melhorar a segurança do tráfego ferroviário na rede ferroviária romena. Consequentemente, a estratégia da CNCF «CFR» SA em matéria de instalações de segurança do tráfego prevê a modernização das instalações de centralização eletromecânica (CEM) utilizando equipamentos de geração recente, que responderiam principalmente à segurança, ao funcionamento, à redução do pessoal de manutenção e aos custos de manutenção. O projeto cont...

22 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:1523:15, 3 August 2022DG Regio talk contribs 109,065 bytes +70,835 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

6 December 2021

1 December 2021

  • curprev 09:0209:02, 1 December 2021DG Regio talk contribs 26,470 bytes +3,770 Created claim: summary (P836): Ziel des Projekts ist die Verbesserung der Sicherheit des Eisenbahnverkehrs im rumänischen Eisenbahnnetz. Infolgedessen sieht die Strategie der CNCF „CFR“ SA für Verkehrssicherheitsanlagen die Modernisierung der elektromechanischen Zentralisierung (EMV) unter Verwendung von Geräten der jüngsten Generation vor, die in erster Linie auf Sicherheit, Betrieb, Reduzierung des Wartungspersonals und Wartungskosten reagieren würden. Das Projekt trägt zur...
  • curprev 09:0209:02, 1 December 2021DG Regio talk contribs 22,700 bytes +152 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4214:42, 27 November 2021DG Regio talk contribs 22,548 bytes +3,922 Created claim: summary (P836): L’objectif du projet est d’améliorer la sécurité du trafic ferroviaire sur le réseau ferroviaire roumain. En conséquence, la stratégie de CNCF «CFR» SA sur les installations de sécurité routière prévoit la modernisation des installations de centralisation électromécanique (EMC) à l’aide d’équipements de génération récente, qui répondraient principalement à la sécurité, à l’exploitation, à la réduction du personnel de maintenance et aux coûts de...
  • curprev 14:4214:42, 27 November 2021DG Regio talk contribs 18,626 bytes +162 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 15,758 bytes +157 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 15,601 bytes +3,474 Created claim: summary (P836): The objective of the project is to improve the safety of rail traffic on the Romanian railway network. As a result, CNCF “CFR” SA’s strategy on traffic safety installations provides for the modernisation of electromechanical centralisation (EMC) installations using recent generation equipment, which would respond primarily to safety, operation, reduction of maintenance personnel and maintenance costs. The project contributes to the achievement o...

14 September 2021