Revision history of "Bridge suspended over the Danube in Braila area" (Q3099030)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:5720:57, 10 October 2024DG Regio talk contribs 98,721 bytes +2 Changed label, description and/or aliases in pt
  • curprev 20:5720:57, 10 October 2024DG Regio talk contribs 98,719 bytes +24 Set a claim value: summary (P836): O objetivo geral do projeto, que faz parte do intercorredor Moldávia-Dobrogea, tal como definido no GTMP, é contribuir para o desenvolvimento regional de Dobrogea, proporcionando uma ligação moderna ao corredor de conectividade nacional 3 (Bucareste-Moldávia), bem como melhores condições de trânsito para o tráfego internacional com destino à Bulgária e à Turquia. A nova ligação reduzirá os tempos de viagem, os custos operacionais dos veículos e a ex...

5 June 2024

22 March 2024

12 June 2023

21 February 2023

20 February 2023

3 August 2022

  • curprev 23:1523:15, 3 August 2022DG Regio talk contribs 98,176 bytes +63,070 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

6 December 2021

1 December 2021

  • curprev 09:0109:01, 1 December 2021DG Regio talk contribs 24,628 bytes +3,411 Created claim: summary (P836): Das allgemeine Ziel des Projekts, Teil des Interkorridors Moldau-Dobrogea, wie im GTMP definiert, besteht darin, zur regionalen Entwicklung von Dobrogea beizutragen, indem eine moderne Verbindung zum nationalen Konnektivitätskorridor 3 (Bucharest-Moldau) sowie verbesserte Transitbedingungen für den internationalen Verkehr nach Bulgarien und der Türkei geschaffen werden. Die neue Verbindung wird die Fahrzeiten, die Fahrzeugbetriebskosten und die...
  • curprev 09:0109:01, 1 December 2021DG Regio talk contribs 21,217 bytes +99 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4214:42, 27 November 2021DG Regio talk contribs 21,118 bytes +3,639 Created claim: summary (P836): L’objectif général du projet, qui fait partie de l’intercorridor Moldavie-Dobrogea, tel qu’il est défini dans le PGGT, est de contribuer au développement régional de Dobrogea en assurant une liaison moderne avec le corridor national de connectivité 3 (Bucharest-Moldova) ainsi que l’amélioration des conditions de transit pour le trafic international vers la Bulgarie et la Turquie. La nouvelle liaison permettra de réduire les temps de déplacement,...
  • curprev 14:4214:42, 27 November 2021DG Regio talk contribs 17,479 bytes +118 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 14,672 bytes +106 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 14,566 bytes +3,187 Created claim: summary (P836): The general objective of the project, part of the Moldova-Dobrogea inter-corridor, as defined in the GTMP, is to contribute to the regional development of Dobrogea by providing a modern link to the national connectivity corridor 3 (Bucharest-Moldova) as well as improved transit conditions for international traffic towards Bulgaria and Turkey. The new link will reduce travel times, vehicle operating costs, and exposure of inhabitants to air and n...

14 September 2021