Revision history of "Construction of the bypass of Brasov Municipality, Tronson I (DN1-DN11), II (DN11-DN13) and III (DN 13-DN 1) Phase II" (Q3098995)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:1609:16, 10 October 2024DG Regio talk contribs 58,065 bytes +9 Changed label, description and/or aliases in pt
  • curprev 09:1609:16, 10 October 2024DG Regio talk contribs 58,056 bytes +12 Set a claim value: summary (P836): O principal objetivo do projeto «Construção da circunvalação de Brasov» é construir 13,63 km de nova estrada no perfil 2x2, bem como alargar 4,924 km do perfil 2x2 para o perfil 4x4. A conclusão dos picles reduzirá o tempo para atravessar Brasov em cerca de 12 minutos. Este projeto é um projeto faseado, a fase I foi financiada pelo POS-T no âmbito do eixo prioritário 2 «Modernização e desenvolvimento das infraestruturas de transportes nacionais fora...

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:1323:13, 3 August 2022DG Regio talk contribs 58,804 bytes +35,516 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 08:4808:48, 1 December 2021DG Regio talk contribs 17,338 bytes +1,753 Created claim: summary (P836): Hauptziel des Projekts „Bau der Umgehungsstraße Brasov“ ist der Bau von 13,63 km neuer Straße auf 2x2 Profil sowie die Erweiterung von 4,924 km vom Profil 2x2 auf 4x4 Profil. Die Fertigstellung der Gurken reduziert die Zeit, Brasov um etwa 12 Minuten zu überqueren. Dieses Projekt ist ein stufenweises Projekt, Phase I wurde aus POS-T im Rahmen der Prioritätsachse 2 „Modernisierung und Entwicklung der nationalen Verkehrsinfrastruktur außerhalb der...
  • curprev 08:4808:48, 1 December 2021DG Regio talk contribs 15,585 bytes +172 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4114:41, 27 November 2021DG Regio talk contribs 15,413 bytes +1,804 Created claim: summary (P836): L’objectif principal du projet «Construction of Brasov bypass» est de construire 13,63 km de nouvelle route sur un profil de 2x2, ainsi que d’élargir 4,924 km du profil 2x2 au profil 4x4. L’achèvement des cornichons réduira le temps de traverser Brasov d’environ 12 minutes. Ce projet est un projet échelonné, la phase I a été financée par POS-T au titre de l’axe prioritaire 2 «Modernisation et développement des infrastructures de transport nation...
  • curprev 14:4114:41, 27 November 2021DG Regio talk contribs 13,609 bytes +186 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 11,631 bytes +177 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 11,454 bytes +1,710 Created claim: summary (P836): The main objective of the project “Construction of Brasov bypass” is to build 13.63 km of new road at 2x2 profile, as well as widening 4.924 km from profile 2x2 to 4x4 profile. The completion of the pickles will reduce the time to cross Brasov by about 12 minutes. This project is a phased project, Phase I was financed from POS-T under Priority Axis 2 “Modernisation and development of national transport infrastructure outside the TEN-T priority a...

14 September 2021