Revision history of "Broadband infrastructure in the white NGA areas of Bihor county" (Q3098993)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

5 June 2024

7 March 2024

19 June 2023

11 June 2023

21 February 2023

3 August 2022

  • curprev 23:1323:13, 3 August 2022DG Regio talk contribs 81,487 bytes +43,891 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 08:4808:48, 1 December 2021DG Regio talk contribs 30,247 bytes +2,316 Created claim: summary (P836): Hauptziel des Projekts ist die Entwicklung der Breitband-Internetinfrastruktur in den weißen Gebieten der NGA in Bihor County mit einer breiten Verbreitung von Kommunikationsknoten und dem Datenübertragungsteil (Backbone und Blackhaul), so nah wie möglich an den Endnutzern und mit einem angemessenen Maß an Symmetrie und Interaktivität, um eine bessere Informationsübertragung in beide Richtungen zu gewährleisten. Durch die Einführung der Zugangsv...
  • curprev 08:4808:48, 1 December 2021DG Regio talk contribs 27,931 bytes +127 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4414:44, 27 November 2021DG Regio talk contribs 27,804 bytes +2,389 Created claim: summary (P836): L’objectif principal du projet est de développer l’infrastructure Internet haut débit dans les zones blanches NGA du comté de Bihor, avec un large éventail de nœuds de communication et la partie de transmission de données (backbone et blackhaul), aussi proche que possible de l’utilisateur final et avec des niveaux adéquats de symétrie et d’interactivité, afin de garantir une meilleure transmission de l’information dans les deux sens. En introdui...
  • curprev 14:4414:44, 27 November 2021DG Regio talk contribs 25,415 bytes +132 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 15,401 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5310:53, 16 September 2021DG Regio talk contribs 15,279 bytes +2,183 Created claim: summary (P836): The main objective of the project is to develop the broadband internet infrastructure in the NGA white areas of Bihor County, with a wide spread of communication nodes and the data transmission part (backbone and blackhaul), as close as possible to the end user and with adequate levels of symmetry and interactivity, in order to guarantee better transmission of information in both directions. By introducing the Next Generation Access connection,...

14 September 2021