Revision history of "Modernisation of DN 73 Pitesti – Campulung – Brasov km 13+ 800-42+ 850; km 54+ 050-128+ 250" (Q3098776)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:3522:35, 9 October 2024DG Regio talk contribs 59,010 bytes +4 Changed label, description and/or aliases in pt
  • curprev 22:3522:35, 9 October 2024DG Regio talk contribs 59,006 bytes −5 Set a claim value: summary (P836): Os principais objetivos deste projeto são: Reabilitação/modernização de 101,98 quilómetros de estradas nacionais, reabilitação de 17 pontes, construção de sete novas pontes (total de pontes 24 peças) e arranjo de 33 intersecções. — Redução do tempo de viagem entre Pitesti e Brasov 9,1 minutos; — Redução dos custos de exploração dos veículos; — aumentar a segurança rodoviária: redução estimada em 10 % do número de acidentes devido à modernização das...

5 June 2024

22 March 2024

20 June 2023

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:0523:05, 3 August 2022DG Regio talk contribs 59,257 bytes +35,765 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 17,593 bytes +1,812 Created claim: summary (P836): Die Hauptziele dieses Projekts sind: Sanierung/Modernisierung von 101,98 Kilometern Nationalstraßen, Sanierung von 17 Brücken, Bau von sieben neuen Brücken (Gesamtbrücken 24 Stück) und Anordnung von 33 Kreuzungen. — Verringerung der Fahrzeit zwischen Pitesti und Brasov 9,1 Minuten; — Senkung der Betriebskosten von Fahrzeugen; — Erhöhung der Verkehrssicherheit: geschätzte Verringerung der Zahl der Unfälle um 10 % aufgrund der Modernisierung des S...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 15,781 bytes +161 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4414:44, 27 November 2021DG Regio talk contribs 15,620 bytes +1,839 Created claim: summary (P836): Les principaux objectifs de ce projet sont les suivants: Réhabilitation/modernisation de 101,98 kilomètres de routes nationales, remise en état de 17 ponts, construction de sept nouveaux ponts (total des ponts 24 pièces) et aménagement de 33 intersections. — Réduction du temps de trajet entre Pitesti et Brasov 9,1 minutes; — Réduction des coûts d’exploitation des véhicules; — accroître la sécurité du trafic: on estime à 10 % la réduction du nomb...

26 November 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

16 September 2021

  • curprev 10:4510:45, 16 September 2021DG Regio talk contribs 12,330 bytes +158 Changed label, description and/or aliases in en: translated_label
  • curprev 10:4510:45, 16 September 2021DG Regio talk contribs 12,172 bytes +1,722 Created claim: summary (P836): The main objectives of this project are: Rehabilitation/modernisation of 101.98 kilometres of national roads, rehabilitation of 17 bridges, construction of seven new bridges (total bridges 24 pieces) and arrangement of 33 intersections. — Reducing travel time between Pitesti and Brasov 9,1 minutes; — Reduction in operating costs of vehicles; — increase traffic safety: estimated 10 % reduction in the number of accidents due to road modernisation...
  • curprev 09:0609:06, 16 September 2021DG Regio talk contribs 10,450 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location

14 September 2021