Revision history of "Support to the SOP IEC Intermediate Body within the North-East RDA during the period 01.01.2016-31.12.2018 in the process of closing SOP IEC 2007-2013 in the North-East Region" (Q3098728)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:4609:46, 9 October 2024DG Regio talk contribs 114,048 bytes +10 Changed label, description and/or aliases in pt
  • curprev 09:4609:46, 9 October 2024DG Regio talk contribs 114,038 bytes −14 Set a claim value: summary (P836): O objetivo geral do projeto consiste em apoiar a conclusão da execução e o encerramento atempado e harmonioso do PON IEC 2007-2013 na região Nordeste, disponibilizando os recursos necessários para as atividades de verificação das despesas e de acompanhamento da execução e da sustentabilidade dos investimentos, entre 1 de janeiro de 2016 e 31.12.2018. O projeto visa apoiar o encerramento do período 2007-2013 relacionado com o PON IEC na região Nordes...

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:0423:04, 3 August 2022DG Regio talk contribs 114,800 bytes +75,747 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 26,334 bytes +4,144 Created claim: summary (P836): Allgemeines Ziel des Projekts ist es, den Abschluss der Durchführung und den rechtzeitigen und reibungslosen Abschluss des SOP IEC 2007-2013 in der Nordostregion zu unterstützen, indem die erforderlichen Mittel für Ausgabenüberprüfungsmaßnahmen bereitgestellt, die Durchführung und Nachhaltigkeit von Investitionen zwischen dem 1. Januar 2016 und dem 31.12.2018 überwacht werden. Das Projekt zielt darauf ab, den Abschluss des Zeitraums 2007-2013 im...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 22,190 bytes +231 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4314:43, 27 November 2021DG Regio talk contribs 21,959 bytes +4,097 Created claim: summary (P836): L’objectif général du projet est de soutenir l’achèvement de la mise en œuvre et la clôture rapide et sans heurt de la SOP IEC 2007-2013 dans la région du Nord-Est, en fournissant les ressources nécessaires aux activités de vérification des dépenses, au suivi de la mise en œuvre et à la durabilité des investissements, entre le 1er janvier 2016 et le 31.12.2018. Le projet vise à soutenir la clôture de la période 2007-2013 liée au POS IEC dans la...
  • curprev 14:4314:43, 27 November 2021DG Regio talk contribs 17,862 bytes +265 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 11:0611:06, 16 September 2021DG Regio talk contribs 15,799 bytes +235 Changed label, description and/or aliases in en: translated_label
  • curprev 11:0611:06, 16 September 2021DG Regio talk contribs 15,564 bytes +3,809 Created claim: summary (P836): The general objective of the project is to support the completion of the implementation and the timely and smooth closure of the SOP IEC 2007-2013 in the North-East Region, by providing the necessary resources for expenditure verification activities, monitoring the implementation and sustainability of investments, between 1 January 2016 and 31.12.2018. The project aims to support the closure of the 2007-2013 period related to SOP IEC in the Nort...

14 September 2021