Revision history of "Project Phase Integrated Waste Management System in Iași County" (Q3095669)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:3323:33, 8 October 2024DG Regio talk contribs 86,466 bytes +3 Changed label, description and/or aliases in pt
  • curprev 23:3323:33, 8 October 2024DG Regio talk contribs 86,463 bytes +44 Set a claim value: summary (P836): O projeto «The Phase of the Integrated Waste Management System Project in Iasi County» é executado ao nível do distrito de Iasi, parte da região de desenvolvimento do nordeste da Roménia, com uma população total de 832 385 habitantes (2010). Todos os investimentos previstos no âmbito deste projeto visam complementar as infraestruturas já existentes no distrito de Iași, o que, em conjunto, assegura um sistema integrado de gestão de resíduos, de modo...

26 June 2024

  • curprev 08:1808:18, 26 June 2024DG Regio talk contribs 86,419 bytes +70 Set a claim value: summary (P836): Le projet «Phasing the Integrated Waste Management System Project in Iasi County» est mis en œuvre au niveau du comté d’Iasi, qui fait partie de la région de développement du Nord-Est de la Roumanie, avec une population totale de 832,385 habitants (2010). Tous les investissements prévus dans le cadre de ce projet ont pour objectif l’achèvement des infrastructures déjà existantes dans le comté d’Iasi, qui, ensemble, garantiront un système intégré de...

5 June 2024

23 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 21:3421:34, 3 August 2022DG Regio talk contribs 86,174 bytes +53,517 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 23,806 bytes +2,804 Created claim: summary (P836): Das Projekt „The Phase of the Integrated Waste Management System Project in Iasi County“ wird auf der Ebene des Kreises Iasi, Teil der Region Nordostentwicklung Rumäniens, mit einer Gesamtbevölkerung von 832.385 Einwohnern (2010) durchgeführt. Alle im Rahmen dieses Projekts vorgesehenen Investitionen zielen darauf ab, die Infrastruktur in der Grafschaft Iași zu ergänzen, die zusammen ein integriertes Abfallbewirtschaftungssystem gewährleistet, s...
  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 21,002 bytes +123 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 20,879 bytes +2,790 Created claim: summary (P836): Proiectul «Fazarea proiectului Sistem de Management Integrat al deșeurilor în județul Iași» este implementationat la nivelul Județului Iași, parte a Regiunii de Dezvoltare Nord-Est a României, cu o populație totală de 832.385 locuitori (2010). Toate investițiile prevăzute în cadrul acestui proiect au ca obiectiv completarea Infrastructurii deja existente în județul Iași, care împreună să asigure un sistem de management integrat al deșeurilor, as...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 18,089 bytes +148 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

16 September 2021

14 September 2021