Revision history of "Project phase Integrated solid waste management system in Vrancea county" (Q3095649)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

9 October 2024

  • curprev 09:4909:49, 9 October 2024DG Regio talk contribs 195,926 bytes +1 Changed label, description and/or aliases in pt
  • curprev 09:4909:49, 9 October 2024DG Regio talk contribs 195,925 bytes +24 Set a claim value: summary (P836): O objectivo geral do projecto é melhorar as infra-estruturas no sector da gestão de resíduos em benefício do ambiente e das pessoas, a fim de cumprir as obrigações decorrentes do Tratado de Adesão. O objetivo do projeto é prosseguir e concluir os trabalhos relacionados com o projeto inicial, que foram iniciados no âmbito do PON Ambiente 2007-2013 e consistiram principalmente nas seguintes medidas: 1. Assegurar uma cobertura de recolha de 100 % nas z...

26 June 2024

  • curprev 08:1408:14, 26 June 2024DG Regio talk contribs 195,901 bytes +157 Set a claim value: summary (P836): L’objectif général du projet est d’améliorer les infrastructures du secteur de la gestion des déchets dans l’intérêt de l’environnement et de la population, afin de satisfaire aux obligations de respect du traité d’adhésion. L’objectif du projet est la poursuite et l’achèvement des travaux liés au projet initial, travaux qui relevaient du SOP ENV 2007-2013 et consistaient principalement en des mesures suivantes: 1. Assurer une couverture de collecte...

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 21:3321:33, 3 August 2022DG Regio talk contribs 196,510 bytes +72,972 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 111,085 bytes +3,944 Created claim: summary (P836): Das allgemeine Ziel des Projekts besteht darin, die Infrastruktur im Abfallwirtschaftssektor zum Nutzen der Umwelt und der Bevölkerung zu verbessern, um den Verpflichtungen zur Einhaltung des Beitrittsvertrags nachzukommen. Ziel des Projekts ist es, die Arbeiten im Zusammenhang mit dem ursprünglichen Projekt fortzusetzen und abzuschließen, die im Rahmen der SOP Umwelt 2007-2013 begonnen wurden und hauptsächlich folgende Maßnahmen umfassten: 1. G...
  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 107,141 bytes +129 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 107,012 bytes +3,835 Created claim: summary (P836): Obiectivul general al proiectului il reprezinta imbunatatirea Infrastructurii in sectorul de management al deseurilor spre beneficiul mediului si al Oamenilor, in vederea indeplinirii obligatiilor de conformare la Tratatul de Aderare. Scopul proiectului este continuarea si finalizarea lucrarilor aferente proiectului initial, Lucrari care au fost in cadrul POS Mediu 2007-2013 si care au constat in principal in urmatoarele masuri: 1. Sa asigure un...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 103,177 bytes +151 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)