Revision history of "Construction of Timisoara Lugoj highway and Timisoara bypass to the highway standard" (Q3095648)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

28 June 2023

12 June 2023

10 March 2023

9 March 2023

21 February 2023

26 January 2023

25 January 2023

3 August 2022

  • curprev 21:3321:33, 3 August 2022DG Regio talk contribs 100,441 bytes +65,788 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 23,620 bytes +3,505 Created claim: summary (P836): LIOP zielt darauf ab, die im TEN-V-Kernnetz gelegene Straßenverkehrsinfrastruktur durch Fertigstellung von Abschnitten zu erweitern, deren Bau im Zeitraum POST 2007-2013 begonnen wurde, und die vom GTMP zu errichtende Infrastruktur, um die Weiterentwicklung des definierten Netzes zu gewährleisten. Dies wird zum einen dazu führen, dass durch die Beseitigung von Engpässen auf den betreffenden Strecken Zeit für den Güter- und Personenverkehr zwisch...
  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 20,115 bytes +134 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 19,981 bytes +3,705 Created claim: summary (P836): Par LIOP vise à élargir les infrastructures de transport routier situées sur le réseau central du RTE-T en complétant les tronçons dont la construction a été entamée au cours de la période POST 2007-2013 et celles qui seront mises en place par le GTMP, afin d’assurer le développement du réseau défini. Cela permettra, tout d’abord, de gagner du temps dans le transport routier de marchandises et de passagers entre les régions de Roumanie et du Cen...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 16,276 bytes +156 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

16 September 2021

  • curprev 10:2710:27, 16 September 2021DG Regio talk contribs 14,827 bytes +143 Changed label, description and/or aliases in en: translated_label
  • curprev 10:2710:27, 16 September 2021DG Regio talk contribs 14,684 bytes +3,137 Created claim: summary (P836): By LIOP seeks to enlarge the road transport infrastructure located on TEN-T core network by completing sections whose construction was started in the POST 2007-2013 period and those to be established by GTMP, ensuring the further development of the defined network. This will lead, first, to save time in road transport of goods and passengers between regions of Romania and Central, West and South as a result of Eliminating bottlenecks on the rout...

15 September 2021

14 September 2021