Revision history of "Project Phase Integrated Waste Management System in Alba County" (Q3095636)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:4909:49, 9 October 2024DG Regio talk contribs 100,775 bytes +7 Changed label, description and/or aliases in pt
  • curprev 09:4909:49, 9 October 2024DG Regio talk contribs 100,768 bytes +37 Set a claim value: summary (P836): O objetivo geral do projeto é prosseguir os trabalhos iniciados no período de programação de 2007-2016, a fim de completar as infraestruturas e os equipamentos existentes com investimentos que conduzirão à realização de um sistema integrado de gestão de resíduos (SMID) no condado de Alba, que alcançará as normas mínimas de conformidade com os requisitos da legislação da UE no setor do ambiente, bem como o cumprimento dos compromissos assumidos pela...

26 June 2024

  • curprev 08:1408:14, 26 June 2024DG Regio talk contribs 100,731 bytes +323 Set a claim value: summary (P836): L’objectif général du projet est de poursuivre les travaux entamés au cours de la période de programmation 2007-2016 afin de compléter les infrastructures et les équipements existants avec des investissements qui mèneront à la réalisation d’un système intégré de gestion des déchets (SMID) dans le comté d’Alba, qui atteindra les normes minimales de conformité avec les exigences de la législation de l’UE dans le secteur de l’environnement, ainsi que l...

5 June 2024

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 21:3321:33, 3 August 2022DG Regio talk contribs 100,218 bytes +63,446 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 25,986 bytes +3,356 Created claim: summary (P836): Allgemeines Ziel des Projekts ist es, die im Programmplanungszeitraum 2007-2016 begonnenen Arbeiten fortzusetzen, um die bestehende Infrastruktur und Ausrüstung mit Investitionen zu vervollständigen, die zur Verwirklichung eines integrierten Abfallbewirtschaftungssystems (SMID) im Kreis Alba führen, das die Mindeststandards für die Einhaltung der Anforderungen der EU-Rechtsvorschriften im Umweltbereich sowie die Erfüllung der Verpflichtungen, di...
  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 22,630 bytes +123 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 22,507 bytes +3,300 Created claim: summary (P836): Obiectivul general al proiectului vizeaza continuarea lucrarilor incepute in perioada de programare 2007-2016 in vederea completarii Infrastructurii si echipamentelor existente cu investitii care vor conduce la realizarea unui sistem de management integrat al deseurilor (SMID) in judetul Alba, prin care se vor atinge Standardele minimal de conformitate cu cerintele legislatiei UE in sectorul de mediu, precum si indeplinirea angajamentelor pe car...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 19,207 bytes +141 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

16 September 2021

  • curprev 10:2710:27, 16 September 2021DG Regio talk contribs 16,943 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 10:2710:27, 16 September 2021DG Regio talk contribs 16,821 bytes +3,220 Created claim: summary (P836): The general objective of the project is to continue the works started in the 2007-2016 programming period in order to complete the existing infrastructure and equipment with investments that will lead to the realisation of an integrated waste management system (SMID) in Alba County, which will achieve the minimum standards of compliance with the requirements of EU legislation in the environmental sector, as well as the fulfilment of the commitme...

15 September 2021

14 September 2021