Revision history of "Preparation of the Sibiu – Pitesti Highway project and the construction of Sections 1, 4 and 5" (Q3095629)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:5620:56, 10 October 2024DG Regio talk contribs 115,721 bytes −2 Changed label, description and/or aliases in pt
  • curprev 20:5620:56, 10 October 2024DG Regio talk contribs 115,723 bytes −2 Set a claim value: summary (P836): O objetivo geral da autoestrada Sibiu – Pitesti, tal como definido na MPGT, é melhorar a eficiência económica da rede de transportes romena, melhorando o tempo de viagem entre Sibiu e Pitesti e melhorando implicitamente a conectividade a nível regional. O objetivo do corredor é proporcionar acesso direto ao mar Negro através de um perfil unitário de autoestrada, bem como a outros países europeus através de ligações fronteiriças. A nova autoestrada é...

5 June 2024

23 March 2024

20 June 2023

12 June 2023

21 February 2023

3 August 2022

  • curprev 21:3321:33, 3 August 2022DG Regio talk contribs 115,971 bytes +75,565 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 27,754 bytes +4,119 Created claim: summary (P836): Das allgemeine Ziel der Autobahn Sibiu – Pitesti im Sinne der MPGT besteht darin, die wirtschaftliche Effizienz des rumänischen Verkehrsnetzes zu verbessern, indem die Reisezeit zwischen Sibiu und Pitesti verbessert und die Konnektivität auf regionaler Ebene implizit verbessert wird. Ziel des Korridors ist es, einen direkten Zugang zum Schwarzen Meer über ein einheitliches Autobahnprofil sowie über Grenzverbindungen zu anderen europäischen Lände...
  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 23,635 bytes +136 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 23,499 bytes +4,251 Created claim: summary (P836): L’objectif général de l’autoroute Sibiu — Pitesti, tel que défini dans le MPGT, est d’améliorer l’efficacité économique du réseau de transport roumain en améliorant le temps de déplacement entre Sibiu et Pitesti et en améliorant implicitement la connectivité au niveau régional. L’objectif du corridor est de fournir un accès direct à la mer Noire par un profil d’autoroute unitaire ainsi qu’à d’autres pays européens grâce à des liaisons frontalièr...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 19,248 bytes +146 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

16 September 2021

  • curprev 10:2610:26, 16 September 2021DG Regio talk contribs 17,394 bytes +155 Changed label, description and/or aliases in en: translated_label
  • curprev 10:2610:26, 16 September 2021DG Regio talk contribs 17,239 bytes +3,828 Created claim: summary (P836): The general objective of Sibiu – Pitesti motorway as defined in the MPGT, is to improve the economic efficiency of the Romanian transport network by improving the traveling time between Sibiu and Pitesti and implicitly improving the connectivity at the regional level. The objective of the corridor is to provide direct access to the Black Sea through a unitary motorway profile as well as to other European countries through border connections. The...

15 September 2021

14 September 2021