Revision history of "Construction of Lugoj highway – Deva lot 2, lot 3 and lot 4 (Dumbrava – Deva sector) – FAZA 2" (Q3095616)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 10:0010:00, 8 October 2024DG Regio talk contribs 53,679 bytes +9 Changed label, description and/or aliases in pt
  • curprev 10:0010:00, 8 October 2024DG Regio talk contribs 53,670 bytes +14 Set a claim value: summary (P836): Os principais objetivos socioeconómicos dos projetos são os seguintes: — Melhorar a eficiência do tráfego através da redução do tempo de viagem; — Melhorar a eficiência dos transportes através da redução dos custos de exploração e manutenção (tanto para os utilizadores como para o operador da infraestrutura); — Melhorar a segurança rodoviária; — Reduzir o impacto ambiental; — Melhorar a acessibilidade. Após a conclusão de ambas as fases, o projeto,...

5 June 2024

22 March 2024

28 June 2023

12 June 2023

10 March 2023

9 March 2023

21 February 2023

26 January 2023

25 January 2023

3 August 2022

  • curprev 21:3221:32, 3 August 2022DG Regio talk contribs 52,325 bytes +30,272 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 17,157 bytes +1,462 Created claim: summary (P836): Die wichtigsten sozioökonomischen Ziele der Projekte sind: — Die Verkehrseffizienz durch Verkürzung der Reisezeit zu verbessern; — Verbesserung der Verkehrseffizienz durch Senkung der Betriebs- und Instandhaltungskosten (sowohl für die Nutzer als auch für den Infrastrukturbetreiber); — Zur Verbesserung der Verkehrssicherheit; — Verringerung der Umweltauswirkungen; — Die Zugänglichkeit zu verbessern. Nachdem beide Phasen abgeschlossen sind, wird...
  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 15,695 bytes +146 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 15,549 bytes +1,509 Created claim: summary (P836): Les principaux objectifs socio-économiques des projets sont les suivants: — Améliorer l’efficacité du trafic par la réduction du temps de déplacement; — Améliorer l’efficacité des transports en réduisant les coûts d’exploitation et d’entretien (tant pour les utilisateurs que pour l’exploitant de l’infrastructure); — Améliorer la sécurité routière; — Réduire l’impact sur l’environnement; — Améliorer l’accessibilité. Une fois les deux phases termi...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 14,040 bytes +165 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021