Revision history of "Project Phase Integrated Waste Management System in Braila County" (Q3095607)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:3323:33, 8 October 2024DG Regio talk contribs 63,946 bytes +7 Changed label, description and/or aliases in pt
  • curprev 23:3323:33, 8 October 2024DG Regio talk contribs 63,939 bytes +11 Set a claim value: summary (P836): O projeto proposto para financiamento pelo LIOP 2014-2020, «Fase do Projeto de Sistema Integrado de Gestão de Resíduos no Condado de Braila», que visa complementar as infraestruturas de gestão de resíduos existentes através da realização de investimentos que conduzam ao desenvolvimento de um sistema integrado de gestão de resíduos. O objetivo deste projeto é analisar e estabelecer um conjunto de medidas que conduzirão gradualmente a um elevado nível...

26 June 2024

  • curprev 08:1808:18, 26 June 2024DG Regio talk contribs 63,928 bytes +74 Set a claim value: summary (P836): Le projet proposé pour un financement de la liop 2014-2020, «Phasing the Integrated Waste Management System Project in Braila County», qui vise à compléter l’infrastructure existante de gestion des déchets en réalisant des investissements conduisant au développement d’un système intégré de gestion des déchets. L’objectif de ce projet est d’analyser et de mettre en place un ensemble de mesures qui mèneront progressivement à un niveau de vie élevé de...

5 June 2024

23 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 21:3221:32, 3 August 2022DG Regio talk contribs 63,670 bytes +39,054 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 18,203 bytes +2,043 Created claim: summary (P836): Das vorgeschlagene Projekt zur Finanzierung des LIOP 2014-2020, „Phase of the Integrated Waste Management System Project in Braila County“, mit dem die bestehende Abfallwirtschaftsinfrastruktur ergänzt werden soll, indem Investitionen getätigt werden, die zur Entwicklung eines integrierten Abfallbewirtschaftungssystems führen. Ziel dieses Projekts ist es, eine Reihe von Maßnahmen zu analysieren und zu etablieren, die schrittweise zu einem hohen...
  • curprev 07:3907:39, 1 December 2021DG Regio talk contribs 16,160 bytes +124 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4414:44, 26 November 2021DG Regio talk contribs 16,036 bytes +1,950 Created claim: summary (P836): Proiectul Propus spre finanțare din POIM 2014-2020, «Fazarea proiectului Sistem de Management Integrat al deseurilor in judetul Braila», care isi propune completarea Infrastructurii existente de gestionare a deseurilor, prin realizarea unor investitii care sa conduca la dezvoltarea unui sistem de management integrat al deseurilor. Scopul PREZENTULUI proiect este acela de a analiza si stabili un set de masuri care sa conduca treptat la un standar...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 14,086 bytes +148 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021