Revision history of "Project Phase Integrate Waste Management System in Suceava County" (Q3095598)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:2622:26, 9 October 2024DG Regio talk contribs 112,238 bytes −14 Changed label, description and/or aliases in pt
  • curprev 22:2622:26, 9 October 2024DG Regio talk contribs 112,252 bytes −18 Set a claim value: summary (P836): O projeto «Sistema integrado de gestão de resíduos no distrito de Suceava», proposto no contexto da adesão da Roménia à União Europeia em 2007, visa colmatar as principais lacunas da gestão de resíduos no distrito de Suceava e criar um sistema integrado de gestão de resíduos em todo o distrito, a fim de assegurar o cumprimento das diretivas no domínio da gestão de resíduos e das disposições do Tratado de Adesão. O projeto foi proposto para financiam...

26 June 2024

  • curprev 08:1408:14, 26 June 2024DG Regio talk contribs 112,270 bytes +104 Set a claim value: summary (P836): Le projet «Système intégré de gestion des déchets dans le comté de Suceava» proposé dans le cadre de l’adhésion de la Roumanie à l’Union européenne en 2007 vise à remédier aux principales lacunes de la gestion des déchets dans le comté de Suceava et à créer un système intégré de gestion des déchets au niveau de l’ensemble du comté, afin d’assurer le respect des directives dans le domaine de la gestion des déchets et des dispositions du traité d’adhé...

5 June 2024

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 21:3221:32, 3 August 2022DG Regio talk contribs 112,401 bytes +73,159 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 27,081 bytes +3,885 Created claim: summary (P836): Das im Rahmen des Beitritts Rumäniens zur Europäischen Union im Jahr 2007 vorgeschlagene Projekt „Integrated Waste Management System in Suceava County“ zielt darauf ab, die großen Mängel der Abfallbewirtschaftung im Landkreis Suceava zu beheben und ein integriertes Abfallbewirtschaftungssystem in der gesamten Grafschaft zu schaffen, um die Einhaltung der Richtlinien im Bereich der Abfallbewirtschaftung und der Bestimmungen des Beitrittsvertrags...
  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 23,196 bytes +129 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4314:43, 26 November 2021DG Regio talk contribs 23,067 bytes +4,003 Created claim: summary (P836): Proiectul«Sistem de management integrat al deșeurilor în județul Suceava» Propus în contextul aderării României la Uniunea Europeană în 2007 urmărește să soluționeze neajunsurile majore ale gestionării deșeurilor în județul Suceava și să creeze la nivelul întregului județ un sistem integrat de gestionare al deșeurilor, în vederea asigurării conformării cu Directivele în domeniul gestionării deșeurilor și prevederile Tratatului de Aderare. Proiec...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 19,064 bytes +146 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021