Revision history of "Bus 4. Connection 2. Park Bazilescu section (PS Zarea) – Straulesti _ Phase II" (Q3095580)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:1309:13, 10 October 2024DG Regio talk contribs 85,786 bytes 0 Changed label, description and/or aliases in pt
  • curprev 09:1309:13, 10 October 2024DG Regio talk contribs 85,786 bytes +30 Set a claim value: summary (P836): O projeto faz parte da secção de investimento PARC Bazilescu – Straulesti, secção atribuída à linha de metro 4, que foi incluída no investimento: Extensões à rede de metropolitano, Secção I Salajan – LINIA DE CENTURA e Secção II GARA DE NORD – BASARAB – LAROMET", aprovado pelo GD n.o 598/08.06.2011. O projeto refere-se à execução e entrada em funcionamento da extensão da linha de metro 4, que facilita a ligação entre o distrito 1 de Bucurestii Noi,...

20 March 2024

28 June 2023

12 June 2023

10 March 2023

9 March 2023

21 February 2023

26 January 2023

25 January 2023

3 August 2022

  • curprev 21:3121:31, 3 August 2022DG Regio talk contribs 84,926 bytes +53,979 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 07:3807:38, 1 December 2021DG Regio talk contribs 21,507 bytes +2,887 Created claim: summary (P836): Das Projekt ist Teil der Investitionsabteilung PARC Bazilescu – Straulesti, Abschnitt der Metrolinie 4, die in die Investition einbezogen wurde: Erweiterungen des Metronetzes, Abschnitt I Salajan – LINIA DE CENTURA und Abschnitt II GARA DE NORD – Basarab – LAROMET", genehmigt durch GD 598/08.06.2011. Das Projekt wird auf die Ausführung und Inbetriebnahme der Erweiterung der Metrolinie 4 verwiesen, die die Verbindung zwischen dem Bezirk 1 Bucures...
  • curprev 07:3807:38, 1 December 2021DG Regio talk contribs 18,620 bytes +140 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4314:43, 26 November 2021DG Regio talk contribs 18,480 bytes +2,979 Created claim: summary (P836): Le projet fait partie de la section d’investissement PARC Bazilescu — Straulesti, section attribuée à la ligne 4 du métro, qui a été incluse dans l’investissement: Extensions du réseau métropolitain, section I Salajan — LINIA DE CENTURA et section II GARA DE NORD — Basarab — LAROMET", approuvées par GD no 598/08.06.2011. Le projet est renvoyé à l’exécution et à la mise en service de l’extension de la ligne de métro 4, facilitant la connexion ent...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 15,501 bytes +138 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021