Revision history of "Reconstruction of Uusmõisa manor park" (Q3079343)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:2622:26, 9 October 2024DG Regio talk contribs 41,407 bytes +3 Changed label, description and/or aliases in pt
  • curprev 22:2622:26, 9 October 2024DG Regio talk contribs 41,404 bytes +5 Set a claim value: summary (P836): A lagoa do parque e a vala da soleira são limpas; eliminar árvores inadequadas e perigosas (72); as infraestruturas do parque (pistas, drenagem, pontes pedonais (2), becos, camas) serão reconstruídas. O autofinanciamento do projeto é cofinanciado pelo Programa Ambiental do CEI.

7 March 2024

6 November 2023

12 June 2023

11 July 2022

  • curprev 18:0118:01, 11 July 2022DG Regio talk contribs 38,561 bytes +22,920 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, nl, et, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 22:0522:05, 30 November 2021DG Regio talk contribs 11,950 bytes +1,126 Created claim: summary (P836): Der Parkteich und der Schwellengraben werden gereinigt; Beseitigung ungeeigneter, gefährlicher Bäume (72); die Parkinfrastruktur (Fußwege, Entwässerung, Fußgängerbrücken (2), Gassen, Betten) wird rekonstruiert. Die Eigenfinanzierung des Projekts wird durch das Umweltprogramm des EIC kofinanziert., translated_summary
  • curprev 22:0522:05, 30 November 2021DG Regio talk contribs 10,824 bytes +88 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 08:2808:28, 26 November 2021DG Regio talk contribs 10,736 bytes +1,121 Created claim: summary (P836): L’étang du parc et le fossé de seuil sont nettoyés; éliminer les arbres inadaptés et dangereux (72); L’infrastructure du parc (passages, drainage, ponts piétonniers (2), ruelles, lits) sera reconstruite. L’autofinancement du projet est cofinancé par le programme environnemental du CEI., translated_summary
  • curprev 08:2808:28, 26 November 2021DG Regio talk contribs 9,615 bytes +105 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021