Revision history of "Construction of forest road 9 water and sewerage infrastructure" (Q3076332)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:1209:12, 10 October 2024DG Regio talk contribs 44,962 bytes +27 Changed label, description and/or aliases in pt
  • curprev 09:1209:12, 10 October 2024DG Regio talk contribs 44,935 bytes −1 Set a claim value: summary (P836): Durante a construção do edifício nesta propriedade, foram instalados tanques de armazenamento para recolher águas residuais em 2001. Os tanques de armazenamento existentes não estão em conformidade com os requisitos atuais e é necessário modernizar o tratamento das águas residuais na propriedade. A rede de esgotos foi concebida para melhorar a segurança ambiental da zona e a qualidade de vida de todos os habitantes.

7 March 2024

6 November 2023

12 June 2023

11 July 2022

  • curprev 16:3016:30, 11 July 2022DG Regio talk contribs 42,104 bytes +25,482 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, nl, et, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 21:1821:18, 30 November 2021DG Regio talk contribs 12,472 bytes +1,215 Created claim: summary (P836): Während des Baus des Gebäudes auf diesem Grundstück wurden im Jahr 2001 Lagertanks installiert, um Abwasser zu sammeln. Die vorhandenen Lagertanks entsprechen nicht den aktuellen Anforderungen und es ist notwendig, die Behandlung von Abwasser auf dem Grundstück zu modernisieren. Der Kanalisationsweg soll die Umweltsicherheit des Gebiets und die Lebensqualität aller Bewohner verbessern., translated_summary
  • curprev 21:1821:18, 30 November 2021DG Regio talk contribs 11,257 bytes +115 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 08:0108:01, 26 November 2021DG Regio talk contribs 11,142 bytes +1,282 Created claim: summary (P836): Lors de la construction du bâtiment sur cette propriété, des réservoirs de stockage ont été installés pour collecter les eaux usées en 2001. Les réservoirs de stockage existants ne sont pas conformes aux exigences actuelles et il est nécessaire de moderniser le traitement des eaux usées sur la propriété. La voie d’assainissement est conçue pour améliorer la sécurité environnementale de la zone et la qualité de vie de tous les habitants., transla...
  • curprev 08:0108:01, 26 November 2021DG Regio talk contribs 9,860 bytes +149 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021