Revision history of "Daystone 4 project" (Q3073972)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:2823:28, 8 October 2024DG Regio talk contribs 41,901 bytes +3 Set a claim value: summary (P836): O projeto visa assegurar a recolha adequada de águas residuais para as pessoas. No decurso do projeto, serão construídas condutas de esgoto com mais de 30 m, em resultado das quais a instalação será ligada à conduta de esgoto, as águas residuais serão devidamente recolhidas e a população utilizará o serviço de esgotos

23 March 2024

7 November 2023

6 November 2023

12 June 2023

11 July 2022

  • curprev 15:2715:27, 11 July 2022DG Regio talk contribs 39,066 bytes +23,304 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, nl, et, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 21:3321:33, 30 November 2021DG Regio talk contribs 12,006 bytes +1,157 Created claim: summary (P836): Das Projekt zielt darauf ab, eine ordnungsgemäße Sammlung von Abwasser für die Menschen zu gewährleisten. Im Laufe des Projekts werden 30+ m Kanalleitungen gebaut, wodurch die Anlage an die Kanalisationsleitung angeschlossen wird, das Abwasser ordnungsgemäß gesammelt und die Bevölkerung den Kanalisationsdienst nutzen wird., translated_summary
  • curprev 21:3321:33, 30 November 2021DG Regio talk contribs 10,849 bytes +77 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 07:2207:22, 26 November 2021DG Regio talk contribs 10,772 bytes +1,184 Created claim: summary (P836): Le projet vise à assurer une collecte adéquate des eaux usées pour les personnes. Au cours du projet, des conduites d’assainissement de plus de 30 m seront construites, ce qui permettra de raccorder l’installation au gazoduc d’assainissement, de collecter correctement les eaux usées et d’utiliser le service d’assainissement de la population., translated_summary
  • curprev 07:2207:22, 26 November 2021DG Regio talk contribs 9,588 bytes +76 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021