Revision history of "Reconstruction of the waste water treatment plant in the town of Põlva" (Q3073531)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:3509:35, 9 October 2024DG Regio talk contribs 42,962 bytes 0 Changed label, description and/or aliases in pt
  • curprev 09:3509:35, 9 October 2024DG Regio talk contribs 42,962 bytes −7 Set a claim value: summary (P836): A estação de tratamento de águas residuais da cidade de Põlva foi construída em 1982 e reconstruída entre 1997 e 1998. Como resultado do projeto, os tanques reconstruídos da estação de tratamento de águas residuais e a tecnologia utilizada cumprem os requisitos atuais. Mais 53 pessoas recebem serviços de água e saneamento.

7 March 2024

7 November 2023

6 November 2023

12 June 2023

17 August 2022

  • curprev 16:2716:27, 17 August 2022DG Regio talk contribs 40,134 bytes +24,130 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,131 bytes +1,110 Created claim: summary (P836): Die Kläranlage der Stadt Põlva wurde 1982 erbaut und zwischen 1997 und 1998 rekonstruiert. Als Ergebnis des Projekts erfüllen die rekonstruierten Kläranlagentanks und die eingesetzte Technologie die aktuellen Anforderungen. Weitere 53 Personen erhalten Wasser- und Sanitärversorgung., translated_summary
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,021 bytes +104 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 07:1907:19, 26 November 2021DG Regio talk contribs 10,917 bytes +1,208 Created claim: summary (P836): L’usine de traitement des eaux usées de la ville de Põlva a été construite en 1982 et reconstruite entre 1997 et 1998. Grâce au projet, les réservoirs reconstruits de la station d’épuration des eaux usées et la technologie utilisée répondent aux exigences actuelles. 53 personnes supplémentaires reçoivent des services d’approvisionnement en eau et d’assainissement., translated_summary
  • curprev 07:1907:19, 26 November 2021DG Regio talk contribs 9,709 bytes +140 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021