Revision history of "Renovation of Kose-Uuemõisa thermal pipeline" (Q3073228)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:3509:35, 9 October 2024DG Regio talk contribs 42,285 bytes +2 Changed label, description and/or aliases in pt
  • curprev 09:3509:35, 9 October 2024DG Regio talk contribs 42,283 bytes −2 Set a claim value: summary (P836): Em Kose-Uuemõisa, está a ser renovado um troço terrestre da escola de aquecimento amortizado. Como resultado da renovação, as perdas de calor no gasoduto de calor diminuirão e a atmosfera do assentamento tornar-se-á mais bonita. Um novo gasoduto térmico será construído para o centro da aldeia de Kose-Uuemõisa e dois edifícios.

7 March 2024

7 November 2023

6 November 2023

12 June 2023

17 August 2022

  • curprev 16:1916:19, 17 August 2022DG Regio talk contribs 39,451 bytes +23,474 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 16:1916:19, 30 November 2021DG Regio talk contribs 12,095 bytes +1,138 Created claim: summary (P836): In Kose-Uuemõisa wird ein bodennaher Abschnitt der amortisierten Wärmeleitungsschule renoviert. Infolge der Renovierung werden Wärmeverluste in der Wärmeleitung abnehmen und die Atmosphäre der Siedlung wird schöner. Eine neue thermische Pipeline wird in das Dorfzentrum Kose-Uuemõisa und zwei Gebäude gebaut., translated_summary
  • curprev 16:1916:19, 30 November 2021DG Regio talk contribs 10,957 bytes +110 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 07:1607:16, 26 November 2021DG Regio talk contribs 10,847 bytes +1,188 Created claim: summary (P836): À Kose-Uuemõisa, une section au sol de l’école de canalisations de chaleur amorties est en cours de rénovation. À la suite de la rénovation, les pertes de chaleur dans le pipeline de chaleur diminueront et l’atmosphère du village deviendra plus belle. Un nouveau pipeline thermique sera construit au centre du village de Kose-Uuemõisa et deux bâtiments., translated_summary
  • curprev 07:1607:16, 26 November 2021DG Regio talk contribs 9,659 bytes +106 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021