Revision history of "Reconstruction of apartment building at Heki St. 4, Ülenurme" (Q3073051)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 09:5609:56, 8 October 2024DG Regio talk contribs 43,502 bytes +3 Set a claim value: summary (P836): O projeto visa restaurar o edifício de apartamentos na sua totalidade, durante o qual todos os filetes abertos são substituídos, a fachada é isolada, o telhado da tampa é construído, a ventilação com recuperação de calor, um sistema central de água quente, aquecimento de dois tubos e um novo nó de calor serão instalados. Além disso, novas adegas serão construídas.

20 March 2024

7 November 2023

6 November 2023

12 June 2023

17 August 2022

  • curprev 16:1416:14, 17 August 2022DG Regio talk contribs 40,665 bytes +24,445 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 16:2916:29, 30 November 2021DG Regio talk contribs 12,305 bytes +1,187 Created claim: summary (P836): Das Projekt zielt darauf ab, das Wohnungsgebäude in seiner Gesamtheit wiederherzustellen, in dem alle offenen Filets ausgetauscht werden, die Fassade isoliert ist, das Deckeldach gebaut wird, Lüftung mit Wärmerückgewinnung, ein zentrales Warmwassersystem, Zweirohrheizung und ein neuer Wärmeknoten installiert werden. Darüber hinaus werden neue Keller gebaut., translated_summary
  • curprev 16:2916:29, 30 November 2021DG Regio talk contribs 11,118 bytes +107 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 07:1207:12, 26 November 2021DG Regio talk contribs 11,011 bytes +1,210 Created claim: summary (P836): Le projet vise à restaurer l’immeuble dans son intégralité, au cours duquel tous les filets ouverts sont remplacés, la façade est isolée, le toit du capuchon est construit, la ventilation avec récupération de chaleur, un système central d’eau chaude, le chauffage à deux tuyaux et un nouveau nœud thermique seront installés. De plus, de nouvelles caves seront construites., translated_summary
  • curprev 07:1207:12, 26 November 2021DG Regio talk contribs 9,801 bytes +131 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021