Revision history of "Creation of a comprehensive database of network facilities (3D) within the Building Register (EHR) and interconnection with other EHR services" (Q3068566)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

6 November 2023

20 June 2023

12 June 2023

17 August 2022

  • curprev 14:1314:13, 17 August 2022DG Regio talk contribs 45,279 bytes +27,793 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 16:1816:18, 30 November 2021DG Regio talk contribs 12,972 bytes +1,290 Created claim: summary (P836): Mit dem Projekt wird eine 3D-Datenbank mit Netzeinrichtungen in der Zusammensetzung des Gebäuderegisters eingerichtet, die die Speicherung von Daten über Netzeinrichtungen in dreidimensionaler Form und den digitalen Datenaustausch in einem Format ermöglicht, das mit modernen Baumethoden kompatibel ist. Als Ergebnis des Projekts wird die Produktivität des Bausektors steigen und die disruptiven Auswirkungen der Bautätigkeiten auf die Umgebung verr...
  • curprev 16:1816:18, 30 November 2021DG Regio talk contribs 11,682 bytes +192 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 06:2506:25, 26 November 2021DG Regio talk contribs 11,490 bytes +1,321 Created claim: summary (P836): Le projet établira une base de données 3D des installations de réseau dans la composition du registre des bâtiments, qui permettra le stockage des données sur les installations du réseau dans un format tridimensionnel et l’échange de données numériques dans un format compatible avec les méthodes modernes de construction. Grâce au projet, la productivité du secteur de la construction augmentera et l’impact perturbateur des activités de constructi...
  • curprev 06:2506:25, 26 November 2021DG Regio talk contribs 10,169 bytes +223 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021