Revision history of "Reconstruction of State Road No 9 Ääsmäe-Haapsalu-Rohuküla km 0.0-18.3 Ääsmäe-Riisipere" (Q3067963)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

6 November 2023

20 June 2023

12 June 2023

17 August 2022

  • curprev 13:5713:57, 17 August 2022DG Regio talk contribs 47,598 bytes +29,303 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 10:0510:05, 30 November 2021DG Regio talk contribs 13,545 bytes +1,409 Created claim: summary (P836): Der Umbau der Straßenoberfläche zwischen km 0-18,3, d. h. insgesamt 18,3 km, ist nach den Grenzen des während des Projekts verfeinerten Arbeitsvolumens geplant. Neben dem Umbau der Straßenoberfläche plant das Projekt, neun nationale Straßenkreuzungen in geringerem Umfang zu rekonstruieren, die auf dem Abschnitt verbliebenen Ausschiffungen zu rekonstruieren, Wasserterminals zu sanieren, die Verkehrskontrollausrüstung zu modernisieren und die Vers...
  • curprev 10:0510:05, 30 November 2021DG Regio talk contribs 12,136 bytes +156 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 06:1606:16, 26 November 2021DG Regio talk contribs 11,980 bytes +1,499 Created claim: summary (P836): La reconstruction de la surface de la route entre 0 et 18,3 km, soit un total de 18,3 km, est prévue selon les limites du volume de travail qui a été affiné au cours du projet. Outre la reconstruction de la surface de la route, le projet prévoit de reconstruire neuf carrefours routiers nationaux dans une moindre mesure, de reconstruire les débarquements restant sur le tronçon, de remettre en état les terminaux d’approvisionnement en eau, de mode...
  • curprev 06:1606:16, 26 November 2021DG Regio talk contribs 10,481 bytes +162 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021