Revision history of "Reconstruction of the Pärnu-Rakvere-Sõmeru Rõusa-Rae section of State Road No 5 (km 48.5-61.7)" (Q3067956)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:3009:30, 9 October 2024DG Regio talk contribs 45,102 bytes −2 Changed label, description and/or aliases in pt
  • curprev 09:3009:30, 9 October 2024DG Regio talk contribs 45,104 bytes −6 Set a claim value: summary (P836): 1. Aumentar o nível de condição do troço de 13 276 km e melhorar a cobertura amortizada. 2. Rismike e a reconstrução das paragens de autocarro. 3. Instalação de protetores de colisão em conformidade com os requisitos atuais do LO. 4. Substituição das almofadas dos navios de partida por novas. 5. Limpeza e alguma mudança de valas existentes para melhor controlar a água da chuva.

7 March 2024

6 November 2023

20 June 2023

12 June 2023

17 August 2022

  • curprev 13:5613:56, 17 August 2022DG Regio talk contribs 42,275 bytes +25,594 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 10:0310:03, 30 November 2021DG Regio talk contribs 12,543 bytes +1,212 Created claim: summary (P836): 1. Erhöhen Sie den Zustand des Abschnitts 13,276 km und verbessern Sie die abgeschriebene Abdeckung. 2. Rismike und der Wiederaufbau von Bushaltestellen. 3. Einbau von Kollisionsschutzeinrichtungen gemäß den aktuellen LO-Anforderungen. 4. Ersatz der Kissen der Abfahrtsschiffe durch neue. 5. Reinigung und einige Verschiebung bestehender Gräben zur besseren Kontrolle des Regenwassers., translated_summary
  • curprev 10:0310:03, 30 November 2021DG Regio talk contribs 11,331 bytes +160 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 06:1506:15, 26 November 2021DG Regio talk contribs 11,171 bytes +1,227 Created claim: summary (P836): 1. Augmenter le niveau d’état du tronçon de 13,276 km et améliorer la couverture amortie. 2. Rismike et la reconstruction des arrêts de bus. 3. Installation de protections contre les collisions conformément aux exigences actuelles de LO. 4. Remplacement des coussins des bateaux de départ par de nouveaux. 5. Nettoyage et déplacement des fossés existants pour mieux contrôler l’eau de pluie., translated_summary
  • curprev 06:1506:15, 26 November 2021DG Regio talk contribs 9,944 bytes +162 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021