Revision history of "State Road No 8 Tallinn – Paldiski km 18.8-24.9 Kiia – Keila section reconstruction" (Q3067955)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:4820:48, 10 October 2024DG Regio talk contribs 48,024 bytes −5 Changed label, description and/or aliases in pt
  • curprev 20:4820:48, 10 October 2024DG Regio talk contribs 48,029 bytes −5 Set a claim value: summary (P836): A fim de alcançar os objetivos, estão planeadas as seguintes atividades: 1. Construção de um novo pavimento correspondente aos parâmetros de largura da classe III e à frequência de carga prevista. Os objetivos podem ser alcançados sem alterar o projeto da estrada existente. 2. Desenhar um perfil longitudinal mais suave. 3. Canalizar o tráfego nos principais cruzamentos ou ajustar a gestão do tráfego existente. 4. Instalação de novos sinais de trânsi...

22 March 2024

6 November 2023

20 June 2023

12 June 2023

17 August 2022

  • curprev 13:5613:56, 17 August 2022DG Regio talk contribs 45,200 bytes +27,690 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl, nl, et, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, hu, bg, lt, hr, sv, ro, sl, pl,

13 January 2022

12 January 2022

5 December 2021

30 November 2021

  • curprev 10:0010:00, 30 November 2021DG Regio talk contribs 13,000 bytes +1,334 Created claim: summary (P836): Zur Erreichung der Ziele sind folgende Maßnahmen geplant: 1. Bau einer neuen Straßenoberfläche, die den Parametern der Breite der Klasse III und der voraussichtlichen Lastfrequenz entspricht. Die Ziele können erreicht werden, ohne die Gestaltung der bestehenden Straße zu ändern. 2. Entwerfen Sie ein glatteres Längsprofil. 3. Kanalverkehr an großen Knotenpunkten oder Anpassung des bestehenden Verkehrsmanagements. 4. Installation neuer Straßenschi...
  • curprev 10:0010:00, 30 November 2021DG Regio talk contribs 11,666 bytes +146 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 06:1706:17, 26 November 2021DG Regio talk contribs 11,520 bytes +1,376 Created claim: summary (P836): Afin d’atteindre les objectifs, les activités suivantes sont prévues: 1. Construction d’un nouveau revêtement de route correspondant aux paramètres de largeur de la classe III et à la fréquence de charge prospective. Les objectifs peuvent être atteints sans modifier la conception de la route existante. 2. Concevoir un profil longitudinal plus lisse. 3. Trafic de chenal à des carrefours majeurs ou ajuster la gestion du trafic existant. 4. Install...
  • curprev 06:1706:17, 26 November 2021DG Regio talk contribs 10,144 bytes +155 Changed label, description and/or aliases in fr: translated_label

18 August 2021

16 August 2021