Revision history of "Electrotechnical measures in mining Gand" (Q3060874)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

21 November 2023

12 June 2023

17 August 2022

  • curprev 12:5912:59, 17 August 2022DG Regio talk contribs 36,136 bytes +22,630 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

12 January 2022

11 January 2022

3 December 2021

  • curprev 14:1414:14, 3 December 2021DG Regio talk contribs 11,209 bytes +606 Changed label, description and/or aliases in de-at, de, and other parts: Moving texts from de-at to de
  • curprev 14:1414:14, 3 December 2021DG Regio talk contribs 10,603 bytes −615 Removed claim: summary (P836): Der tiefer gelegene „Markusstollen“ wurde durch ein Wegbaggern des vorgelagerten Lockergesteins wieder zugänglich gemacht und dieser Abschnitt mit einer neuen, ausreichend dimensionierten, etwa 16 Meter langen Holzzimmerung versehen., Removing bad summary

29 November 2021

27 November 2021

  • curprev 09:4209:42, 27 November 2021DG Regio talk contribs 10,077 bytes +1,036 Created claim: summary (P836): La galerie «Markusstollen» située en bas a été rendue accessible par un dragage de la roche lâche en amont et équipée d’un nouvel espace en bois, suffisamment dimensionné, d’environ 16 mètres de long., translated_summary

26 November 2021

3 September 2021

22 July 2021

20 July 2021

19 July 2021