Revision history of "Introduction of new production technologies and Industry 4.0" (Q3060867)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

21 November 2023

12 June 2023

17 August 2022

  • curprev 12:5912:59, 17 August 2022DG Regio talk contribs 37,684 bytes +23,789 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

12 January 2022

11 January 2022

3 December 2021

  • curprev 14:1414:14, 3 December 2021DG Regio talk contribs 11,433 bytes +613 Changed label, description and/or aliases in de-at, de, and other parts: Moving texts from de-at to de
  • curprev 14:1414:14, 3 December 2021DG Regio talk contribs 10,820 bytes −622 Removed claim: summary (P836): Das Projekt ist der Erwerb einer nach den Anforderungen von Bohr Schleifmittelwerk zu fertigende CNC-Bearbeitungsmaschine (high tech Produktionsstraße) und einer IT-Ausstattung für die Umsetzung von Industrie 4.0. Die Kosten betragen TEUR 660., Removing bad summary

29 November 2021

27 November 2021

  • curprev 09:4209:42, 27 November 2021DG Regio talk contribs 10,252 bytes +1,110 Created claim: summary (P836): Le projet est l’acquisition d’une machine d’usinage CNC (chaîne de production de haute technologie) à fabriquer selon les exigences de l’usine d’abrasif de forage et d’un équipement informatique pour la mise en œuvre de l’Industrie 4.0. Le coût s’élève à 660 EUR., translated_summary

26 November 2021

3 September 2021

22 July 2021

20 July 2021

19 July 2021