Revision history of "Reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section km 57.56-65.10" (Q3057649)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:2223:22, 8 October 2024DG Regio talk contribs 56,706 bytes +3 Changed label, description and/or aliases in pt
  • curprev 23:2223:22, 8 October 2024DG Regio talk contribs 56,703 bytes −25 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução da estrada nacional regional P73 Vecumnieki – Nereta – Subate km 57.56-65.10, que inclui a construção de um edredão e a aquisição de terrenos. A duração total prevista do projecto é de 51 meses. O custo total previsto do projeto é de 7287607,38 EUR, incluindo o financiamento previsto do Fundo Europeu de Desenvolvimento Regional – 6194466,27 EUR e o financiamento do orçamento do Estado – 1093141,11 EUR. Em resul...

7 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4120:41, 3 August 2022DG Regio talk contribs 56,003 bytes +34,856 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1518:15, 28 November 2021DG Regio talk contribs 17,294 bytes +1,741 Created claim: summary (P836): Het doel van het project is de wederopbouw van de nationale regionale weg P73 Vecumnieki — Nereta — Subate section 57,56-65.10, die de aanleg van een bestrating en de aankoop van grond omvat. Geplande totale duur van de uitvoering van het project 51 maanden. Totale projectkosten 7 287 607,38 EUR, inclusief geplande financiering uit het Europees Fonds voor Regionale Ontwikkeling — 6 194 466,27 EUR en financiering uit de overheidsbegroting — 1 093...
  • curprev 18:1518:15, 28 November 2021DG Regio talk contribs 15,553 bytes +161 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,392 bytes +1,727 Created claim: summary (P836): Ziel des Projekts ist es, die nationale Regionalstraße P73 Vecumnieki – Nereta – Subate Abschnitt 57.56-65.10 zu rekonstruieren, die den Bau eines Bürgersteigs und den Erwerb von Grundstücken umfasst. Geplante Gesamtlaufzeit der Projektdurchführung 51 Monate. Projektkosten insgesamt 7 287 607,38 EUR, einschließlich der geplanten Finanzierung aus dem Europäischen Fonds für regionale Entwicklung – 6 194 466,27 EUR und staatliche Mittel – 1 093 141...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 13,665 bytes +163 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 13,502 bytes +1,750 Created claim: summary (P836): L’objectif du projet est de reconstruire la route nationale régionale P73 Vecumnieki — Nereta — Sous-section 57.56-65.10, qui comprend la construction d’un trottoir et l’achat de terrains. Durée totale prévue de mise en œuvre du projet 51 mois. Le coût total du projet est de 7 287 607,38 EUR, y compris le financement prévu par le Fonds européen de développement régional — 6 194 466,27 EUR et le financement du budget de l’État — 1 093 141,11 EUR....
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 11,752 bytes +165 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,167 bytes +164 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,003 bytes +1,675 Created claim: summary (P836): The aim of the project is reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate km 57.56-65.10, which includes the construction of a duvet and the purchase of land. The total planned duration of the project is 51 months. The planned total cost of the project is EUR 7287607,38, including the planned European Regional Development Fund funding – EUR 6194466.27 and the state budget funding – EUR 1093141.11. As a result of the...

14 July 2021

13 July 2021