Revision history of "Reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33 (bridge)" (Q3057645)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 09:0409:04, 11 October 2024DG Regio talk contribs 61,540 bytes +12 Changed label, description and/or aliases in pt
  • curprev 09:0409:04, 11 October 2024DG Regio talk contribs 61,528 bytes +2 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução da estrada nacional regional P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33, obras de reconstrução da ponte, do casco e do túnel de Viesīte, que incluem a construção de um edredão, a supervisão da construção e a supervisão do autor. A duração total prevista do projecto é de 39 meses. O custo total previsto do projeto é de 9046063,18 EUR, incluindo o financiamento previsto do Fundo Euro...

12 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4120:41, 3 August 2022DG Regio talk contribs 60,801 bytes +38,439 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1518:15, 28 November 2021DG Regio talk contribs 17,975 bytes +1,929 Created claim: summary (P836): Het doel van het project is de wederopbouw van de nationale regionale weg P73 Vecumnieki — Nereta — Subate sectie Krasti — ↓rber... km 29.20-40,33, de wederopbouw van Viesīte brug, culvert en tunnel, die de bouw van een bestrating, bouwtoezicht, auteur toezicht omvat. Geplande totale duur van de uitvoering van het project 39 maanden. De totale kosten van het project bedragen 9 046 063,18 EUR, inclusief de geplande financiering van het Europees F...
  • curprev 18:1518:15, 28 November 2021DG Regio talk contribs 16,046 bytes +187 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,859 bytes +1,922 Created claim: summary (P836): Ziel des Projektes ist der Wiederaufbau der nationalen Regionalstraße P73 Vecumnieki – Nereta – Subate Abschnitt Krasti-Rbere km 29,20-40,33, der Wiederaufbau von Viesīte Brücke, Sculvert und Tunnel, die den Bau eines Pflasters, Bauaufsicht, Autorüberwachung umfasst. Geplante Gesamtdauer der Projektdurchführung 39 Monate. Die Gesamtkosten des Projekts belaufen sich auf 9 046 063,18 EUR, einschließlich der geplanten Finanzierung des Europäischen...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 13,937 bytes +191 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 13,746 bytes +1,958 Created claim: summary (P836): L’objectif de ce projet est la reconstruction de la route régionale nationale P73 Vecumnieki — Nereta — Sous-section Krasti — km 29,20-40,33, la reconstruction du pont, ponceau et tunnel Viesīte, qui comprend la construction d’un trottoir, la supervision de la construction et la supervision de l’auteur. Durée totale prévue de mise en œuvre du projet 39 mois. Le coût total du projet s’élève à 9 046 063,18 EUR, y compris le financement prévu du Fo...
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 11,788 bytes +191 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,177 bytes +194 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 10,983 bytes +1,833 Created claim: summary (P836): The aim of the project is the reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33, Viesīte bridge, culvert and tunnel reconstruction works, which include construction of a duvet, construction supervision, author supervision. The total planned duration of the project is 39 months. The planned total cost of the project is EUR 9046063,18, including the planned European Regional Devel...

14 July 2021

13 July 2021