Revision history of "Reconstruction of the national regional road P32 Upper Līgatne – Skriveri section Upper Līgatne – Nītaure km 0.006-13.96 (bridge)" (Q3057629)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 June 2023

12 June 2023

17 August 2022

  • curprev 12:3812:38, 17 August 2022DG Regio talk contribs 62,430 bytes +38,060 Changed label, description and/or aliases in el, da, fi, mt, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, lv, es, and other parts: Adding translations: el, da, fi, mt, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1218:12, 28 November 2021DG Regio talk contribs 20,089 bytes +1,859 Created claim: summary (P836): Het doel van het project is de wederopbouw van de nationale regionale weg P32 Augšlīgatne — Skrīveri sectie Augšlīgatne — Nītaure km 0.006-13,96, die de aanleg van een bestrating, bouwtoezicht, auteurstoezicht en landaanwerving omvat. Geplande totale duur van de uitvoering van het project 39 maanden. De totale kosten van het project bedragen 9 925 090,44 EUR, inclusief de geplande financiering van het Europees Fonds voor Regionale Ontwikkeling —...
  • curprev 18:1218:12, 28 November 2021DG Regio talk contribs 18,230 bytes +190 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 18,040 bytes +1,879 Created claim: summary (P836): Ziel des Projekts ist der Wiederaufbau der nationalen Regionalstraße P32 Augšlīgatne – Skrīveri Abschnitt Augšlīgatne – Nītaure km 0,006-13,96, die den Bau eines Gehwegs, Bauaufsicht, Autorenaufsicht und Landerwerb umfasst. Geplante Gesamtdauer der Projektdurchführung 39 Monate. Die Gesamtkosten des Projekts belaufen sich auf 9 925 090,44 EUR, einschließlich der geplanten Finanzierung des Europäischen Fonds für regionale Entwicklung – 84 363 236...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 16,161 bytes +197 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 15,964 bytes +1,940 Created claim: summary (P836): L’objectif du projet est la reconstruction de la route régionale nationale P32 Augšlīgatne — Skrīveri tronçon Augšlīgatne — Nītaure km 0,006-13,96, qui comprend la construction d’un trottoir, la supervision de la construction, la supervision de l’auteur et l’acquisition de terrains. Durée totale prévue de mise en œuvre du projet 39 mois. Le coût total du projet s’élève à 9 925 090,44 EUR, y compris le financement prévu du Fonds européen de dével...
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 14,024 bytes +197 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 13,407 bytes +196 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 13,211 bytes +1,802 Created claim: summary (P836): The aim of the project is the state regional road P32 Upper Līgatne – Skriveri section Upper Līgatne – Nītaure km 0.006-13.96, reconstruction works of the Strauta bridge, which include construction, construction supervision, author supervision and purchase of land. The total planned duration of the project is 39 months. The planned total cost of the project is EUR 9925090,44, including the planned European Regional Development Fund funding – EUR...

14 July 2021

13 July 2021