Revision history of "Reconstruction of national regional road P73 Vecumnieki – Nereta – Subate section Valle parish border – bridge over Iecava (km 7.30-20.89)" (Q3057622)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4120:41, 3 August 2022DG Regio talk contribs 64,966 bytes +40,161 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 20,148 bytes +2,075 Created claim: summary (P836): Het doel van het project is de wederopbouw van de nationale regionale weg P73 Vecumnieki — Nereta — Subate sectie Valle parochie — brug over Iecava (km 7,30-20,89), Iecava brug, Vārnupīte (Pančupīte) en Svētupīte culvert, die de bouw van een deken, toezicht op de bouw, het toezicht op de auteur en aankoop van gronden omvat. Geplande totale duur van de uitvoering van het project 28 maanden. De totale kosten van het project bedragen 13 572 950,22 ...
  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 18,073 bytes +198 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 17,875 bytes +2,061 Created claim: summary (P836): Ziel des Projekts sind die Wiederaufbauarbeiten der nationalen Regionalstraße P73 Vecumnieki – Nereta – Teilbereich Valle Pfarrei – Brücke über Iecava (km 7,30-20,89), Iecava Brücke, Vārnupīte (Pančupīte) und Svētupīte culvert, die den Bau einer Decke, Bauaufsicht, die Aufsicht des Autors und den Erwerb von Grundstücken umfasst. Geplante Gesamtlaufzeit der Projektdurchführung 28 Monate. Die Gesamtkosten des Projekts belaufen sich auf 13 572 950,...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,814 bytes +202 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 15,612 bytes +2,156 Created claim: summary (P836): L’objectif du projet est les travaux de reconstruction de la route régionale nationale P73 Vecumnieki — Nereta — Sous-section de la paroisse Valle — pont au-dessus d’Iecava (km 7,30-20,89), du pont Iecava, de Vārnupīte (Pančupīte) et du ponceau de Svētupīte, qui comprend la construction d’une couverture, la supervision de la construction, la supervision de l’auteur et l’achat de terres. Durée totale prévue de mise en œuvre du projet 28 mois. Le...
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 13,456 bytes +211 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 12,825 bytes +204 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 12,621 bytes +1,922 Created claim: summary (P836): The aim of the project is the construction works of the state regional road P73 Vecumnieki – Nereta – Subate section Valle Parish – bridge over Iecava (km 7.30-20.89), Iecava bridge, Vārnupīte (Pančupīte) and Svētupīte duct, which include construction, construction supervision, author supervision and purchase of land. The total planned duration of the project is 28 months. The planned total cost of the project is EUR 13572950,22, including the p...

14 July 2021

13 July 2021