Revision history of "Reconstruction of the main state motorway A12 Jekabpils – Rezekne – Ludza – Russian border (Terehova), km 114.34-125.14 duvet reconstruction" (Q3057611)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:5220:52, 10 October 2024DG Regio talk contribs 58,005 bytes −3 Changed label, description and/or aliases in pt
  • curprev 20:5220:52, 10 October 2024DG Regio talk contribs 58,008 bytes +8 Set a claim value: summary (P836): O objetivo do projeto é reconstruir o edredão e a ponte (aumentando a capacidade de carga do edredão), o que inclui a construção de novos pavimentos de betão asfáltico, a reconstrução da ponte, a supervisão da construção, a supervisão do autor, em resultado da qual serão proporcionadas condições de condução confortáveis e seguras aos utentes da estrada. A duração total prevista do projecto é de 40 meses. Custo total estimado do projeto: 12195122 EUR...

7 March 2024

14 June 2023

12 June 2023

17 August 2022

  • curprev 12:3812:38, 17 August 2022DG Regio talk contribs 57,275 bytes +34,114 Changed label, description and/or aliases in el, da, fi, mt, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, lv, es, and other parts: Adding translations: el, da, fi, mt, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 19,317 bytes +1,678 Created claim: summary (P836): Het doel van het project is de wederopbouw van de bestrating en de brug (verhoging van het draagvermogen van de bestrating), waaronder de bouw van een nieuw asfalt betonnen bestrating, de wederopbouw van de brug, bouwtoezicht, toezicht op de auteur, waardoor de weggebruikers worden voorzien van comfortabele en veilige rijomstandigheden. Geplande totale duur van de uitvoering van het project 40 maanden. De totale kosten van het project worden ger...
  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 17,639 bytes +173 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 17,466 bytes +1,677 Created claim: summary (P836): Ziel des Projekts ist die Durchführung des Wiederaufbaus des Bürgersteigs und der Brücke (Erhöhung der Tragfähigkeit des Bürgersteigs), einschließlich des Baus eines neuen Asphaltbetonpflasters, des Wiederaufbaus der Brücke, der Bauaufsicht, der Aufsicht des Autors, wodurch die Verkehrsteilnehmer mit komfortablen und sicheren Fahrbedingungen versorgt werden. Geplante Gesamtdauer der Projektdurchführung 40 Monate. Die Gesamtkosten des Projekts we...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,789 bytes +177 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 15,612 bytes +1,715 Created claim: summary (P836): L’objectif du projet est de réaliser la reconstruction du trottoir et du pont (augmentation de la capacité portante de la chaussée), qui comprend la construction d’un nouveau trottoir en béton bitumineux, la reconstruction du pont, la supervision de la construction, la supervision de l’auteur, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 40...
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 13,897 bytes +184 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 13,293 bytes +206 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 13,087 bytes +1,602 Created claim: summary (P836): The aim of the project is to rebuild the duvet and bridge (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, reconstruction of the bridge, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 40 months. Estimated total cost of the project EUR 12195122. As a r...

14 July 2021

13 July 2021