Revision history of "Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 24.40-38.18 duvet (bridge)" (Q3057608)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4020:40, 3 August 2022DG Regio talk contribs 53,231 bytes +31,990 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 17,542 bytes +1,627 Created claim: summary (P836): Het doel van het project is de wederopbouw van de bestrating en de brug (verhoging van het draagvermogen van de bestrating), waaronder de bouw van nieuwe asfaltbeton bestrating, bouwtoezicht, toezicht op de auteur, waardoor de weggebruikers worden voorzien van comfortabele en veilige rijomstandigheden. Geplande totale duur van de uitvoering van het project 29 maanden. De totale kosten van het project worden geraamd op 17 544 860 EUR. Als gevolg...
  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 15,915 bytes +139 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3709:37, 28 November 2021DG Regio talk contribs 15,776 bytes +1,625 Created claim: summary (P836): Ziel des Projekts ist die Durchführung des Wiederaufbaus des Bürgersteigs und der Brücke (Erhöhung der Tragkraft des Bürgersteigs), einschließlich des Baus neuer Asphaltbetonpflaster, der Bauaufsicht und der Überwachung des Autors, wodurch die Verkehrsteilnehmer mit komfortablen und sicheren Fahrbedingungen ausgestattet werden. Geplante Gesamtdauer der Projektdurchführung 29 Monate. Die Gesamtkosten des Projekts werden auf 17 544 860 EUR veransc...
  • curprev 09:3709:37, 28 November 2021DG Regio talk contribs 14,151 bytes +145 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 14,006 bytes +1,683 Created claim: summary (P836): L’objectif du projet est d’effectuer la reconstruction du trottoir et du pont (augmentation de la capacité portante de la chaussée), qui comprend la construction de nouveaux chaussées en béton bitumineux, la supervision de la construction, la supervision de l’auteur, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 29 mois. Le coût total du proj...
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 12,323 bytes +149 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,754 bytes +161 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,593 bytes +1,530 Created claim: summary (P836): The aim of the project is to rebuild the duvet and bridge (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 29 months. Estimated total cost of the project EUR 17544860. As a result of the project, the main...

14 July 2021

13 July 2021