Revision history of "Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 97.58-99.74 and 102.92-113.13 duvets" (Q3057600)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 09:0409:04, 11 October 2024DG Regio talk contribs 53,769 bytes 0 Changed label, description and/or aliases in pt
  • curprev 09:0409:04, 11 October 2024DG Regio talk contribs 53,769 bytes −16 Set a claim value: summary (P836): O objetivo do projeto é reconstruir o edredão (aumentando a capacidade de carga do edredão), o que inclui a construção de novos pavimentos de betão asfáltico, a reconstrução de bueiros, que garantirão condições de condução confortáveis e seguras para os utentes da estrada. A duração total prevista do projecto é de 27 meses. O custo total estimado do projeto é de 14394009,7 EUR. Em resultado do projeto, será organizada a principal autoestrada estatal...

7 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4020:40, 3 August 2022DG Regio talk contribs 53,060 bytes +31,935 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 17,465 bytes +1,649 Created claim: summary (P836): Het doel van het project is de verbouwing van de bestrating (verhoging van het draagvermogen van de bestrating), met inbegrip van de bouw van een nieuw asfalt betonnen bestrating, de wederopbouw van de beklimmingen, waardoor de weggebruikers worden voorzien van comfortabele en veilige rijomstandigheden. Geplande totale duur van de uitvoering van het project 27 maanden. De totale kosten van het project worden geraamd op 14 394 009,7 EUR. Als gevo...
  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 15,816 bytes +149 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,667 bytes +1,595 Created claim: summary (P836): Ziel des Projekts ist die Durchführung eines Umbaus des Bürgersteigs (Erhöhung der Tragkraft des Bürgersteigs), der den Bau eines neuen Asphaltbetonpflasters, den Wiederaufbau der Sackgassen umfasst, wodurch die Verkehrsteilnehmer mit komfortablen und sicheren Fahrbedingungen ausgestattet werden. Geplante Gesamtdauer der Projektdurchführung 27 Monate. Die Gesamtkosten des Projekts werden auf 14 394 009,7 EUR veranschlagt. Als Ergebnis der Durchf...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 14,072 bytes +153 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3220:32, 25 November 2021DG Regio talk contribs 13,919 bytes +1,649 Created claim: summary (P836): L’objectif du projet est d’effectuer une reconstruction de la chaussée (augmentation de la capacité portante de la chaussée), qui comprend la construction d’un nouveau trottoir en béton bitumineux, la reconstruction des ponceaux, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 27 mois. Le coût total du projet est estimé à 14 394 009,7 EUR. À la...
  • curprev 20:3220:32, 25 November 2021DG Regio talk contribs 12,270 bytes +160 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,690 bytes +171 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 11,519 bytes +1,499 Created claim: summary (P836): The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, reconstruction of culverts, which will ensure comfortable and safe driving conditions for road users. The total planned duration of the project is 27 months. The estimated total cost of the project is EUR 14394009,7. As a result of the project, the main state motorway A9 Riga (Skulte) will b...

14 July 2021

13 July 2021