Revision history of "The main state motorway A2 Riga – Sigulda – the Estonian Rob. (Veclaicene), km 15.40-25.50 rebuilding of duvet (both carriageway)" (Q3057592)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4020:40, 3 August 2022DG Regio talk contribs 53,981 bytes +33,330 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 16,849 bytes +1,613 Created claim: summary (P836): Het doel van het project is de verbouwing van de bestrating (verhoging van het draagvermogen van de bestrating), met inbegrip van de bouw van nieuw asfalt beton, toezicht op de bouw, toezicht op de auteur, waardoor de weggebruikers worden voorzien van comfortabele en veilige rijomstandigheden. Geplande totale duur van de uitvoering van het project 26 maanden. De totale kosten van het project worden geraamd op 19 214 335,90 EUR. Als gevolg van de...
  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 15,236 bytes +197 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,039 bytes +1,580 Created claim: summary (P836): Ziel des Projekts ist die Durchführung eines Umbaus des Bürgersteigs (Erhöhung der Tragkraft des Bürgersteigs), der den Bau eines neuen Asphaltbetonbetons, die Bauaufsicht, die Überwachung des Autors, deren Folge den Verkehrsteilnehmern komfortable und sichere Fahrbedingungen bietet. Geplante Gesamtdauer der Projektdurchführung 26 Monate. Die Gesamtkosten des Projekts werden auf 19 214 335,90 EUR veranschlagt. Als Ergebnis der Umsetzung des Proj...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 13,459 bytes +193 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3220:32, 25 November 2021DG Regio talk contribs 13,266 bytes +1,673 Created claim: summary (P836): L’objectif du projet est d’effectuer une reconstruction de la chaussée (augmentation de la capacité portante de la chaussée), qui comprend la construction de nouvelles chaussées en béton bitumineux, la supervision de la construction, la supervision de l’auteur, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 26 mois. Le coût total du projet est...
  • curprev 20:3220:32, 25 November 2021DG Regio talk contribs 11,593 bytes +228 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 10,945 bytes +193 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 10,752 bytes +1,570 Created claim: summary (P836): The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of...

14 July 2021

13 July 2021