Revision history of "Improvement of energy efficiency of preschool educational establishments on Metalistu Street 2, Rezekne" (Q3057087)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 09:5409:54, 8 October 2024DG Regio talk contribs 69,218 bytes 0 Changed label, description and/or aliases in pt
  • curprev 09:5409:54, 8 October 2024DG Regio talk contribs 69,218 bytes +7 Set a claim value: summary (P836): As principais atividades do projeto são as obras de melhoria da eficiência energética — obras de melhoria da eficiência energética — parede do edifício, telhado, cobertura do subsolo e isolamento das fundações, substituição de portas exteriores, renovação do sistema de aquecimento, substituição do sistema de aquecimento, substituição de antigas condutas de água quente e reconstrução do sistema de ventilação, renovação da eficiência energética do edi...

7 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:2520:25, 3 August 2022DG Regio talk contribs 68,486 bytes +43,430 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:0718:07, 28 November 2021DG Regio talk contribs 19,828 bytes +2,472 Created claim: summary (P836): Het doel van het project is om de energie-efficiëntie van het gebouw van de voorschoolse onderwijsinstelling op 2 Metālistu Street, Rezekne, te verhogen door investeringen in het gebouw te doen in overeenstemming met de prioriteiten van het ontwikkelingsprogramma van de lokale overheid, waardoor het primaire energieverbruik en de lokale overheidsuitgaven voor verwarming worden verminderd. De belangrijkste activiteiten van het project zijn energi...
  • curprev 18:0718:07, 28 November 2021DG Regio talk contribs 17,356 bytes +169 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3209:32, 28 November 2021DG Regio talk contribs 17,187 bytes +2,438 Created claim: summary (P836): Ziel des Projekts ist es, die Energieeffizienz des Gebäudes der vorschulischen Bildungseinrichtung in der 2 Metālistu Street, Rezekne, durch Investitionen in das Gebäude entsprechend den Prioritäten des Entwicklungsprogramms der Kommunalverwaltung zu erhöhen und so den Primärenergieverbrauch und die kommunalen Ausgaben für Heizung zu reduzieren. Die Hauptaktivitäten des Projekts sind Energieeffizienzverbesserungsarbeiten – Isolierung von Außenwä...
  • curprev 09:3209:32, 28 November 2021DG Regio talk contribs 14,749 bytes +165 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:1020:10, 25 November 2021DG Regio talk contribs 14,584 bytes +2,582 Created claim: summary (P836): L’objectif du projet est d’accroître l’efficacité énergétique de la construction de l’établissement d’enseignement préscolaire au 2 rue Metālistu, Rezekne, en investissant dans le bâtiment conformément aux priorités définies dans le programme de développement de l’administration locale, réduisant ainsi la consommation d’énergie primaire et les dépenses des administrations locales pour le chauffage. Les principales activités du projet sont les tr...
  • curprev 20:1020:10, 25 November 2021DG Regio talk contribs 12,002 bytes +199 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4112:41, 15 July 2021DG Regio talk contribs 11,382 bytes +163 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4112:41, 15 July 2021DG Regio talk contribs 11,219 bytes +2,026 Created claim: summary (P836): The main activities of the project are energy efficiency improvement works – energy efficiency improvement works – building wall, roof, basement cover and foundation insulation, replacement of external doors, renovation of heating system, replacement of the heating system, replacement of hot water old pipelines and reconstruction of the ventilation system, renovation of the building’s energy efficiency, non-monitoring of the building’s public wo...

14 July 2021

13 July 2021