Revision history of "Improvement of energy efficiency in the building of the stationary section 6 of the State Ltd. “Strench psychoneurological hospital”" (Q3057034)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:2320:23, 3 August 2022DG Regio talk contribs 77,663 bytes +48,636 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:0618:06, 28 November 2021DG Regio talk contribs 22,403 bytes +3,015 Created claim: summary (P836): Het doel van het project is de energie-efficiëntie in het gebouw van de stationaire afdeling 6 van het SIA „Strenču Psychoneurological Hospital” te verbeteren door isolatie van externe bouwschils te implementeren en het verwarmingssysteem te renoveren, alsook door het visuele uiterlijk van de architectonische delen van de gevels van het gebouw te waarborgen in overeenstemming met de historische originele gevel en interieurafwerking na raamvervan...
  • curprev 18:0618:06, 28 November 2021DG Regio talk contribs 19,388 bytes +198 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3209:32, 28 November 2021DG Regio talk contribs 19,190 bytes +2,798 Created claim: summary (P836): Ziel des Projekts ist es, die Energieeffizienz im Gebäude des stationären Bereichs 6 des SIA „Strenču Psychoneurological Hospital“ zu verbessern, indem die Isolierung externer Gebäudehüllen und die Renovierung des Heizsystems sowie die visuelle Erscheinungsbild der architektonischen Teile der Fassaden des Gebäudes entsprechend der historischen ursprünglichen Fassade und der Innenveredelung nach dem Fensteraustausch realisiert werden.Entwicklung...
  • curprev 09:3209:32, 28 November 2021DG Regio talk contribs 16,392 bytes +186 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:1020:10, 25 November 2021DG Regio talk contribs 16,206 bytes +3,130 Created claim: summary (P836): L’objectif du projet est d’améliorer l’efficacité énergétique dans le bâtiment de la division stationnaire 6 du SIA «Strenču Psychoneurological Hospital» en mettant en œuvre l’isolation des enveloppes extérieures du bâtiment et en rénovant le système de chauffage, ainsi que d’assurer l’apparence visuelle des parties architecturales des façades du bâtiment conformément à la façade originale historique et à la finition intérieure après le remplace...
  • curprev 20:1020:10, 25 November 2021DG Regio talk contribs 13,076 bytes +206 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4112:41, 15 July 2021DG Regio talk contribs 12,450 bytes +196 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4112:41, 15 July 2021DG Regio talk contribs 12,254 bytes +2,426 Created claim: summary (P836): The aim of the project is to increase energy efficiency in the building of the VSIA “Strench Psychoneurological Hospital” in the building, implementing insulation of external building envelopes and renovation of heating system, as well as providing visual appearance of architectural details of the building in accordance with historically original facade and interior decoration after replacement of windows. 1. The planned thermal energy savings a...

14 July 2021

13 July 2021