Revision history of "Implementation of measures promoting energy efficiency in the production unit of “Rettenmeier Baltic Timber” Ltd." (Q3056892)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 09:5409:54, 8 October 2024DG Regio talk contribs 65,187 bytes +1 Set a claim value: summary (P836): O objetivo do projeto é investir na unidade de produção da «Rettenmeier Baltic Timber» Ltd., a fim de utilizar os recursos energéticos de forma mais eficiente e reduzir o consumo de energia no processo de produção. No âmbito do projeto, os planos tomam medidas para promover a utilização eficiente dos recursos energéticos e a redução do consumo de energia na unidade de produção da «Rettenmeier Baltic Timber», situada nas ruas 30, 26 e 28 de Plānupes,...

12 March 2024

12 June 2023

3 August 2022

  • curprev 20:2020:20, 3 August 2022DG Regio talk contribs 64,461 bytes +41,448 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:0818:08, 28 November 2021DG Regio talk contribs 18,599 bytes +2,070 Created claim: summary (P836): Het doel van het project is om te investeren in de productie-installatie van „Rettenmeier Baltic Timber” Ltd. om de verbruikte energiebronnen efficiënter te gebruiken en het energieverbruik in het productieproces te verminderen. In het kader van het project is het de bedoeling maatregelen te nemen om een efficiënt gebruik van energiebronnen te bevorderen en het energieverbruik te verminderen in de productie-installatie van SIA „Rettenmeier Balti...
  • curprev 18:0818:08, 28 November 2021DG Regio talk contribs 16,529 bytes +139 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3309:33, 28 November 2021DG Regio talk contribs 16,390 bytes +2,022 Created claim: summary (P836): Ziel des Projekts ist es, in die Produktionsanlage „Rettenmeier Baltic Timber“ Ltd. zu investieren, um die verbrauchten Energieressourcen effizienter zu nutzen und den Energieverbrauch im Produktionsprozess zu senken. Im Rahmen des Projekts ist geplant, Maßnahmen zu ergreifen, um die effiziente Nutzung der Energieressourcen und die Verringerung des Energieverbrauchs in der Produktionsanlage von SIA „Rettenmeier Baltic Timber“, in der 30, 26 und...
  • curprev 09:3309:33, 28 November 2021DG Regio talk contribs 14,368 bytes +133 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:0920:09, 25 November 2021DG Regio talk contribs 14,235 bytes +2,164 Created claim: summary (P836): L’objectif du projet est d’investir dans l’usine de production de «Rettenmeier Baltic Timber» Ltd. afin d’utiliser plus efficacement les ressources énergétiques consommées et de réduire la consommation d’énergie dans le processus de production. Dans le cadre du projet, il est prévu de prendre des mesures pour promouvoir l’utilisation efficace des ressources énergétiques et la réduction de la consommation d’énergie dans l’usine de production de S...
  • curprev 20:0920:09, 25 November 2021DG Regio talk contribs 12,071 bytes +147 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:3912:39, 15 July 2021DG Regio talk contribs 11,503 bytes +177 Changed label, description and/or aliases in en: translated_label
  • curprev 12:3912:39, 15 July 2021DG Regio talk contribs 11,326 bytes +1,948 Created claim: summary (P836): The aim of the project is to invest in the production unit of “Rettenmeier Baltic Timber” Ltd. in order to use energy resources more efficiently and to reduce energy consumption in the production process.Within the project, planots take measures to promote efficient use of energy resources and reduction of energy consumption in the production unit of “Rettenmeier Baltic Timber”, which is located at 30, 26 and 28, Plānupes streets, Inčukalns, Inč...

14 July 2021

13 July 2021