Revision history of "Improvement of energy efficiency in the production building" (Q3056872)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:2909:29, 9 October 2024DG Regio talk contribs 63,985 bytes +1 Set a claim value: summary (P836): A Jūrmalas Mežparki Ltd. está a planear a execução de um projeto «Aumentar a eficiência energética no edifício de produção», cujo objetivo é promover a redução do consumo de energia e aumentar a eficiência energética do edifício no edifício de produção da Jurmala Forestparks Ltd. A execução do projeto será realizada no âmbito da direção de produção prioritária nacional correspondente à NACE Rev. 2. O projeto visa renovar e isolar um edifício de prod...

22 March 2024

12 June 2023

3 August 2022

  • curprev 20:1920:19, 3 August 2022DG Regio talk contribs 63,259 bytes +40,212 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:0718:07, 28 November 2021DG Regio talk contribs 18,587 bytes +2,096 Created claim: summary (P836): SIA Jūrmalas Mežaparki is van plan het project „Verhoging van de energie-efficiëntie in het productiegebouw” uit te voeren, dat tot doel heeft de vermindering van het energieverbruik te bevorderen en de energie-efficiëntie van het gebouw in het SIA Jūrmalas Mežaparki-productiegebouw te verhogen. De uitvoering van het project vindt plaats in het kader van de nationale prioritaire productieas die overeenkomt met de NACE Rev. 2. Het project is bed...
  • curprev 18:0718:07, 28 November 2021DG Regio talk contribs 16,491 bytes +126 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3309:33, 28 November 2021DG Regio talk contribs 16,365 bytes +2,049 Created claim: summary (P836): SIA Jūrmalas Mežaparki plant die Umsetzung des Projekts „Erhöhung der Energieeffizienz im Produktionsgebäude“, dessen Ziel es ist, den Energieverbrauch zu senken und die Energieeffizienz des Gebäudes in SIA Jūrmalas Mežaparki zu steigern. Die Durchführung des Projekts wird in der nationalen Prioritätsachse der NACE Rev. 2 durchgeführt. Das Projekt zielt darauf ab, das Produktionsgebäude zu renovieren und zu isolieren und das Heizsystem zu rekon...
  • curprev 09:3309:33, 28 November 2021DG Regio talk contribs 14,316 bytes +115 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:0820:08, 25 November 2021DG Regio talk contribs 14,201 bytes +2,221 Created claim: summary (P836): SIA Jūrmalas Mežaparki prévoit de mettre en œuvre le projet «Accroître l’efficacité énergétique dans le bâtiment de production», dont l’objectif est de promouvoir la réduction de la consommation d’énergie et d’accroître l’efficacité énergétique du bâtiment dans le bâtiment de fabrication SIA Jūrmalas Mežaparki. La mise en œuvre du projet sera réalisée dans le cadre de l’axe national prioritaire de production correspondant à la NACE Rév. 2. Le p...
  • curprev 20:0820:08, 25 November 2021DG Regio talk contribs 11,980 bytes +129 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:3912:39, 15 July 2021DG Regio talk contribs 11,430 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 12:3912:39, 15 July 2021DG Regio talk contribs 11,312 bytes +2,021 Created claim: summary (P836): Jūrmalas Mežparki Ltd. is planning to implement a project “Increasing energy efficiency in the production building”, the aim of which is to promote the reduction of energy consumption and increase the energy efficiency of the building in the production building of Jurmala Forestparks Ltd. The implementation of the project will be carried out under the national priority production direction corresponding to NACE Rev. 2. The project aims to renov...

14 July 2021

13 July 2021